PlaceDossier / BC places / Thompson-Nicola

Thompson-Nicola, Electoral Area I (Blue Sky Country)

An electoral area of the Thompson-Nicola Regional District. 1,038 people lived here in 2021, down 17.7% from 2016, on 5,788 km² of land. It takes in Walhachin, Spences Bridge, Kanaka Bar, Boston Flats and 1 more.

BC place · electoral area

How Area I compares with BC's other rural areas

  1. Evacuations: 7 orders to leave since April 2017 (fire and flood). The latest order in July 2024. One of 65 of BC's 159 rural electoral areas with one.
  2. Wildfire: the 10th most land burned since 1996 of BC's 159 rural electoral areas. 37% of its land, compared with 2% in a typical rural area.typical
  3. Emergency care: the nearest emergency department open around the clock is in Kamloops, 47 km away in a straight line. The one nearer, in Ashcroft, keeps set hours (Mon 08:00 - 20:00, and so on).

Typical for its size No scheduled buses, 1 licensed child care provider and 2 fire halls.

How we compare

Each figure is set against BC's places of the same kind: cities of 50,000 or more, towns of 10,000 to 50,000, towns of 2,000 to 10,000, villages and towns under 2,000, or rural electoral areas. A figure stands out when it's among the top tenth of its kind at the end that matters to a buyer and clearly off the typical one, the middle place of that kind. Where fewer than 15 places of its kind have the figure, it's set against all BC places with it. A figure only counts when its source speaks for the place: a climate or air station within 15 km and 300 m of its ground, the place's own police service, at least 1,000 people for census figures and 25 homes for internet. A point that stands out has an ochre bar on its left, its section's stamp is filled ochre, and a dot in the bar at the top of the page marks that section; "Typical for its size" is a plain outline and "Nothing on record" a dotted one. In each strip a tick is one place, the tall tick the typical one, the dot this place, and the end that matters on the right. Facts that matter at any size (an evacuation order, emergency care far away, little mobile coverage) are said whatever the size, and mark a section as standing out only when they too are in the top tenth of its kind. A section is marked typical only where a figure in it is set against the typical one and none sits far from it (outside the middle half of its kind, or clearly off the typical one), and "nothing on record" only where it shows nothing.

Area I outlined. Zoom in to see its lots; tap one for its report.

Hazards Stands out

Evacuations: 7 orders to leave since April 2017 (fire and flood). The latest order in July 2024. One of 65 of BC's 159 rural electoral areas with one.

  • Wildfire: the 10th most land burned since 1996 of BC's 159 rural electoral areas. 37% of its land, compared with 2% in a typical rural area.typical
Burned by wildfire since 1996
37% typical rural area: 2%
Years with a mapped wildfire since 1917
81, the latest 2025
Evacuation events since April 2017
7 with an order to leave, 8 with alerts only; the latest order July 2024, the latest alert July 2026
Radon: homes tested at or above the guideline in its health region
6.4% in Thompson Cariboo Shuswap (BC: 7.9%)
More on hazards

Its land, ranked in BC

HereRank in BC
In the farmland reserve (ALR)9.5%132nd of 267
Burned by wildfire since 199637%12th of 215 (tied)
Years with a mapped wildfire since 191781most recent 2025
Under mineral, placer or coal titles30%29th of 219 (tied)
Land area5,788 km²

Shares of the land area, worked out from the Province's maps. Fire perimeters before the 1950s are less complete. A title or a past fire somewhere in the area says nothing about a given lot: a property report checks the parcel itself.

Large fires (1,000 ha or more) since 1990

Since 1990, 27 wildfires of 1,000 ha or more burned in Area I, together 210,942 ha, 36% of its land (ground that burned twice counts once). The most here was the Lytton Creek wildfire in 2021, 73,713 ha.

2026: 4,261 ha here2025: 1,472 ha here2024: 27,740 ha here2023: 16,122 ha here2022: 6,124 ha here2021: 105,926 ha here2017: 28,280 ha here2015: 2,152 ha here2014: 1,238 ha here2013: 1,322 ha here2009: 9,432 ha here2005: 3,520 ha here2003: 5,754 ha here1997: 990 ha here1996: 9,821 ha here19902000201020202026
  1. 2026Ainslie Creek wildfire69,706 ha in all · 3% of it here2,371 ha here
  2. 2026Unnamed fire K716681,306 ha in all1,306 ha here
  3. 2026Pear Lake wildfire165,909 ha in all · under 1% of it here584 ha here
  4. 2025Cantilever Bar wildfire1,472 ha in all1,472 ha here
  5. 2024Shetland Creek wildfire27,972 ha in all · 99% of it here27,740 ha here
  6. 2023Kookipi Creek wildfire17,561 ha in all · 31% of it here5,427 ha here
  7. 2023Ponderosa Creek wildfire5,022 ha in all5,022 ha here
  8. 2023Stein Mountain wildfire4,734 ha in all · 96% of it here4,544 ha here
  9. 2023Cottonwood Creek wildfire1,129 ha in all1,129 ha here
  10. 2022Nohomin Creek wildfire3,746 ha in all · 90% of it here3,362 ha here
And 17 more
  1. 2022Unnamed fire K714402,762 ha in all2,762 ha here
  2. 2021Lytton Creek wildfire83,671 ha in all · 88% of it here73,713 ha here
  3. 2021Tremont Creek wildfire62,524 ha in all · 37% of it here23,228 ha here
  4. 2021George Road wildfire5,017 ha in all · 98% of it here4,934 ha here
  5. 2021Mowhokam Creek wildfire5,098 ha in all · 79% of it here4,051 ha here
  6. 2017Elephant Hill wildfire192,017 ha in all · 15% of it here28,280 ha here
  7. 2015Cisco Road wildfire2,174 ha in all · 99% of it here2,152 ha here
  8. 2014Unnamed fire K702701,240 ha in all1,238 ha here
  9. 2013Spatsum Creek wildfire1,420 ha in all · 93% of it here1,322 ha here
  10. 2009Unnamed fire K711107,835 ha in all7,835 ha here
  11. 2009Intlpam wildfire1,597 ha in all1,597 ha here
  12. 2005Sleetsis Creek wildfire3,520 ha in all3,520 ha here
  13. 2003Unnamed fire K206245,221 ha in all · 76% of it here3,985 ha here
  14. 2003Unnamed fire K706201,769 ha in all1,769 ha here
  15. 1997Unnamed fire K701031,057 ha in all · 94% of it here990 ha here
  16. 1996Unnamed fire K702224,944 ha in all4,944 ha here
  17. 1996Unnamed fire K702394,877 ha in all4,877 ha here

Smaller mapped fires since 2016

Since 2016, the BC Wildfire Service mapped 77 smaller fires (under 1,000 ha) that reached Area I, newest first. This season's are as mapped by November 9, 2026.

  1. 2026Saw Creek wildfire656 ha in all · 63% of it here414 ha here
  2. 2026Unnamed fire K2002513 ha in all · 88% of it here11 ha here
  3. 2026Unnamed fire K7165112 ha in all12 ha here
  4. 2026Jimmies Creek wildfire7.6 ha in all7.6 ha here
  5. 2026Unnamed fire K700223.3 ha in all · 11% of it here0.4 ha here
  6. 2026Unnamed fire K201793.1 ha in all3.1 ha here
  7. 2026Unnamed fire K602072.9 ha in all2.9 ha here
  8. 2026Unnamed fire K704642.7 ha in all2.7 ha here
And 69 more
  1. 2026Unnamed fire K201621.6 ha in all · 7% of it here0.1 ha here
  2. 2025Izman Creek wildfire243 ha in all243 ha here
  3. 2025Unnamed fire K206095.6 ha in all5.6 ha here
  4. 2025Unnamed fire K215561 ha in all1 ha here
  5. 2024Unnamed fire K6039552 ha in all52 ha here
  6. 2024Unnamed fire K7010733 ha in all33 ha here
  7. 2024Unnamed fire K214368.2 ha in all8.2 ha here
  8. 2024Unnamed fire K709344.1 ha in all4.1 ha here
  9. 2024Unnamed fire K210201.3 ha in all1.3 ha here
  10. 2023Rutledge wildfire651 ha in all651 ha here
  11. 2023Unnamed fire K73066480 ha in all480 ha here
  12. 2023Izman Creek wildfire132 ha in all132 ha here
  13. 2023Drinkwater wildfire16 ha in all · 66% of it here11 ha here
  14. 2023Papsilque Creek wildfire1.4 ha in all1.4 ha here
  15. 2022Maria Creek FSR wildfire997 ha in all · 11% of it here110 ha here
  16. 2022Unnamed fire K72080740 ha in all740 ha here
  17. 2022Unnamed fire K72076418 ha in all418 ha here
  18. 2022Lower Arthur Seat wildfire25 ha in all25 ha here
  19. 2022Minaberriet Creek 1 wildfire17 ha in all · 21% of it here3.5 ha here
  20. 2022Murray Creek wildfire11 ha in all11 ha here
  21. 2022Unnamed fire K714419.1 ha in all9.1 ha here
  22. 2022Unnamed fire K210977 ha in all7 ha here
  23. 2022Spatsum Creek wildfire6 ha in all · 62% of it here3.7 ha here
  24. 2022Unnamed fire K208173.7 ha in all3.7 ha here
  25. 2022Juniper Knoll wildfire2.3 ha in all2.3 ha here
  26. 2022Skuhun Ridge wildfire1.6 ha in all1.6 ha here
  27. 2022Unnamed fire K217601.1 ha in all1.1 ha here
  28. 2022Kawku Road wildfire1.1 ha in all · 91% of it here1 ha here
  29. 2022Unnamed fire K224760.5 ha in all0.5 ha here
  30. 2022Laluwissin Creek wildfire0.2 ha in all0.2 ha here
  31. 2021Hat Creek #1 wildfire27 ha in all27 ha here
  32. 2021Unnamed fire K204997.3 ha in all · 88% of it here6.4 ha here
  33. 2021Unnamed fire K207984.5 ha in all4.5 ha here
  34. 2021Unnamed fire K216143.9 ha in all · 80% of it here3.1 ha here
  35. 2021Mclean Lake wildfire1.3 ha in all1.3 ha here
  36. 2021Basque Rd & Highway 1 wildfire1.3 ha in all1.3 ha here
  37. 2021E Fraser Rv/n Lytton wildfire1.3 ha in all · 48% of it here0.6 ha here
  38. 2021Back Valley Rd wildfireunder 0.1 ha in allunder 0.1 ha here
  39. 2020Unnamed fire K7004531 ha in all · 98% of it here30 ha here
  40. 2020Unnamed fire K6058129 ha in all29 ha here
  41. 2020Unnamed fire K7122011 ha in all11 ha here
  42. 2020Unnamed fire K609614.2 ha in all4.2 ha here
  43. 2020Siwash Creek wildfire1.9 ha in all1.9 ha here
  44. 2020Basque Road wildfire1.4 ha in all1.4 ha here
  45. 2020Nighthawk Ranch wildfire1.1 ha in all1.1 ha here
  46. 2019Semlin Ranch wildfire41 ha in all41 ha here
  47. 2019Unnamed fire K711958.3 ha in all · 20% of it here1.7 ha here
  48. 2019Jimmies Creek wildfire5.8 ha in all5.8 ha here
  49. 2019Unnamed fire K214355.8 ha in all5.8 ha here
  50. 2019Unnamed fire K210162.5 ha in all2.5 ha here
  51. 2019Unnamed fire K200341.5 ha in all1.5 ha here
  52. 2018Unnamed fire K7142976 ha in all76 ha here
  53. 2018Unnamed fire K6041753 ha in all53 ha here
  54. 2018Unnamed fire K7218021 ha in all21 ha here
  55. 2018Unnamed fire K7000918 ha in all18 ha here
  56. 2018Unnamed fire K608972.5 ha in all2.5 ha here
  57. 2018Unnamed fire K210502.3 ha in all2.3 ha here
  58. 2018Unnamed fire K707481.8 ha in all1.8 ha here
  59. 2018Unnamed fire K72677under 0.1 ha in allunder 0.1 ha here
  60. 2017Unnamed fire K7136634 ha in all34 ha here
  61. 2017Unnamed fire K623406.1 ha in all · 7% of it here0.5 ha here
  62. 2017Unnamed fire K701885.9 ha in all5.9 ha here
  63. 2017Unnamed fire K700015.7 ha in all · 5% of it here0.3 ha here
  64. 2017Unnamed fire K200090.7 ha in all0.7 ha here
  65. 2016South Spencer Road wildfire538 ha in all · 92% of it here496 ha here
  66. 2016Unnamed fire K700686.9 ha in all6.9 ha here
  67. 2016Unnamed fire K200435.4 ha in all5.4 ha here
  68. 2016Unnamed fire K700202.8 ha in all2.8 ha here
  69. 2016Unnamed fire K200991.1 ha in all1.1 ha here

Small fires that were never mapped as a perimeter aren't listed: the BC Wildfire Service maps an outline for only some of the fires it records. Past fire is history, not a forecast. The chance of fire on a lot today depends on what the record doesn't show: the forest and grass around it, the slope, what has been thinned or burned since, and how far it is from a fire hall. Every BC season and large fire since 1990.

Sources: BC Wildfire Fire Perimeters – Historical, BC Wildfire Service; BC Wildfire Fire Perimeters – Current, BC Wildfire Service; BC Wildfire Fire Incident Locations – Historical, BC Wildfire Service; BC Wildfire Fire Locations – Current, BC Wildfire Service (Open Government Licence – British Columbia), as published on November 10, 2026; 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence). Outlines simplified and places measured by PlaceDossier.

How the land burned

On the Province's ecosystem map, Area I's land is 51% NDT4 (burned often and lightly, every 4 to 50 years), 31% NDT3 (burned in large fires about every 100 to 150 years), 10% NDT5 (alpine tundra and subalpine parkland) and 8% NDT2 (burned in large fires about every 200 years). Its main biogeoclimatic zones are Interior Douglas-fir (39%), Engelmann Spruce–Subalpine Fir (29%) and Montane Spruce (16%). In the dry forest and grassland of NDT4, a century of putting fires out has let many stands fill in, building up fuel that can carry a crown fire instead of a light surface fire. This is how the land burned before fires were put out, not its fire risk today. A report names the type over a lot. Every place's natural fire regime.

Source: BEC Map (biogeoclimatic zones and natural disturbance types), Province of BC (Open Government Licence – British Columbia), read 2026-10-12; areas worked out on the census boundaries.

Evacuations since April 2017

Since April 2017, the Province's record holds 10 wildfire events with an evacuation order or alert over Area I, 6 with an order. The latest order: Shetland Creek Wildfire, July 2024.

  1. 2026Pear Lake WildfireJuly 2026 · evacuation alert · Thompson-Nicola Regional District71 homes
  2. 2026Saw Creek WildfireJune 2026 · evacuation alert · TNRD165 homes
  3. 2024Shetland Creek WildfireJuly 2024 · evacuation order and alert · Thompson-Nicola Regional District295 homes
  4. 2023Kookipi Creek WildfireAugust 2023 · evacuation order and alert · Thompson-Nicola Regional District78 homes
  5. 2022Nohomin Creek WildfireJuly 2022 · evacuation alert · Thompson-Nicola Regional District31 homes
  6. 2021Mowhokam Creek WildfireAugust 2021 · evacuation order · Thompson Nicola Regional District29 homes
  7. 2021Tremont Creek WildfireJuly 2021 · evacuation order and alert · Thompson-Nicola Regional District398 homes
  8. 2021Lytton Creek WildfireJune 2021 · evacuation order · Thompson-Nicola Regional District206 homes
And 2 more
  1. 2018Spences BridgeJuly 2018 · evacuation alert · Thompson Nicola Regional District136 homes
  2. 2017Elephant Hill WildfireJuly 2017 · evacuation order and alert · Band Council Resolution (BCR) and Thompson-Nicola Regional District211 homes

Listed when an order or alert area covered at least 5% of the land in Area I, or lay mostly in Area I and held at least 5% as many homes as the 2021 census counted there. An order means people were told to leave; an alert, to be ready to leave. Homes are the record's own counts, area by area, shown where the areas lie mostly in Area I. The Province's record starts in April 2017: earlier evacuations aren't in it. A lot's report checks every order and alert over the lot itself, and any in effect now.

Sources: Historical Orders and Alerts, Emergency Management and Climate Readiness (Open Government Licence – British Columbia), as published on November 2, 2026; 2021 census subdivision boundaries and dwelling counts, Statistics Canada (Statistics Canada Open Licence). Each order and alert area placed in the municipalities and electoral areas it covers by us.

Evacuations for floods, landslides and other hazards since April 2017

Since April 2017, the Province's record holds 5 flood events with an evacuation order or alert over Area I, 1 with an order. The latest order: TNRD - Area I (Blue Sky Country), November 2021.

  1. 2026Saw Creek WildfireJune 2026 · evacuation alert (flood) · TNRD165 homes
  2. 2021TNRD - Area I (Blue Sky Country)November 2021 · evacuation order (flood) · Thompson-Nicola Regional District48 homes
  3. 2021Thompson-Nicola Regional District - Electoral Areas I,M,NNovember 2021 · evacuation alert (flood) · Thompson-Nicola Regional District
  4. 2021South TNRD Flooding – Electoral Area I,M,NNovember 2021 · evacuation alert (flood) · Thompson-Nicola Regional District885 homes
  5. 2020Bonaparte River FloodJuly 2020 · evacuation alert (flood) · Village of Cache Creek49 homes

Listed when an order or alert area covered at least 5% of the land in Area I, or lay mostly in Area I and held at least 5% as many homes as the 2021 census counted there. An order means people were told to leave; an alert, to be ready to leave. Homes are the record's own counts, area by area, shown where the areas lie mostly in Area I. The Province's record starts in April 2017: earlier evacuations aren't in it. A lot's report checks every order and alert over the lot itself, and any in effect now.

Sources: Historical Orders and Alerts, Emergency Management and Climate Readiness (Open Government Licence – British Columbia), as published on November 2, 2026; 2021 census subdivision boundaries and dwelling counts, Statistics Canada (Statistics Canada Open Licence). Each order and alert area placed in the municipalities and electoral areas it covers by us.

1,044 landslides are recorded inside Area I in the Preliminary Canadian Landslide Database (version 14.0), including 763 debris flows, 58 earth slides and 55 debris floods. The latest with a date of its own: a debris flow, 19 Jul 2025 (listed under “Shetland Creek Fire”). The database lists slides known to have happened, mapped from inventories, satellite images and lidar. It isn't a hazard map, and some parts of BC are mapped in far more detail than others. Landslides near a given lot.

The Province lists 29 dams in Area I, 12 of them classed High or above for the harm a failure would do downstream: Botanie Lake Dam (High), Ruddock Lake Dam (High) and McLean Lake Dam (High) among them. One of them is recorded as breached (failed). The class rates what a failure would do, not how likely one is; a report names the dams within 1 km of a lot. Dams in BC, by place.

12 Water Survey of Canada gauges in Area I have 5 or more years of yearly peak flows: Thompson River near Spences Bridge peaked highest at 4,130 m³/s in 1972 (71 years on record), Nicola River near Spences Bridge peaked highest at 406 m³/s in 1997 (42 years on record) and Ambusten Creek near the Mouth peaked highest at 1 m³/s in 1981 (20 years on record), among others. 1 set its record in the last 10 years. A gauge's record is the river where it stands, not a flood line; a report gives the nearest gauge on a river by the lot. River gauges in BC, by place.

Radon

In the Thompson Cariboo Shuswap health region, 7 of the 109 homes tested (6.4%) in Health Canada's 2009–2011 survey were at or above the 200 Bq/m³ guideline; across BC, 143 of 1,817 (7.9%).

The survey tested about a hundred volunteer homes per health region, with one long-term test each. That gives a rough regional picture: it isn't a map, and a region where few or none tested high can still have homes above the guideline. The only way to know is to test the home: radon and buying a home in BC.

Source: Cross-Canada Survey of Radon Concentrations in Homes (2009–2011), Health Canada (Open Government Licence – Canada); Health Service Delivery Area Boundaries, Province of BC (Open Government Licence – British Columbia).

Check one lot: has it burned? · is it on a floodplain map? · is it behind a dike? · is there a dam nearby? · landslides nearby? · contaminated sites nearby? · radon? · how much is too steep?

Source: Agricultural Land Reserve polygons, Agricultural Land Commission (Open Government Licence – British Columbia); Fire perimeters – historical, BC Wildfire Service (Open Government Licence – British Columbia); Mineral, placer and coal tenures, Mineral Titles Branch (Open Government Licence – British Columbia); Preliminary Canadian Landslide Database, version 14.0 (May 2026), Brideau et al. (CC BY 4.0); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Cost to own Typical for its size

Homes: the typical home costs 5.3 years of a typical household's income, compared with 7.1 years in a typical rural area.

Typical home value against typical household income
5.3 years of income typical rural area: 7.1 years
Median home value (owners' estimate, 2021)
$348,000
Median monthly rent (2021)
$715
Speculation and vacancy tax
doesn't apply here
More on cost to own

Property tax

In Area I, the Province collects the property tax. At 2026 rates every home here pays at least $4.65 per $1,000 of assessed value: about $4,653 a year on a $1,000,000 home, before the home owner grant. Local service areas (fire protection, recreation, street lighting, water and others) cover parts of the area and add to that, up to $3.33 per $1,000 each; which ones cover a given lot is on its tax notice.

  • Regional district (the electoral area's share) $0.90
  • Regional hospital district $1.06
  • School (set by the Province) $2.14
  • Provincial rural tax $0.39
  • Police tax $0.13
  • Other $0.04
Where each $1,000 of assessed value goes, 2026, before local service areas.
$

On $500,000: at least about $2,327 a year; on $1,000,000: at least about $4,653, at 2026 rates, before the home owner grant.

Your bill uses BC Assessment's value for the property, which can differ from its price, and may also include parcel taxes and utility fees (water, sewer, garbage) that aren't rates on value. The home owner grant takes up to $570 off the bill of a home its owner lives in ($770 in the Province's northern and rural area in 2026, and up to $845, or $1,045 there, for seniors, veterans and people with a disability), for homes assessed at $2,075,000 or less in 2026; above that it shrinks by $5 for each $1,000. From 2027 the northern and rural extra ends and the regular grant is $570 everywhere. The owner applies each year, and must pay at least $350 in tax ($100 for the higher grant) after it. Our summary of the Province's page, read 2026-10-04. Rural rates aren't ranked: what a home pays depends on the service areas it's in. Confirm with the Province's Surveyor of Taxes. How property tax works in BC.

Source: The Surveyor of Taxes' rural tax rates, 2026, Province of BC (the rates only: facts set in public bylaws, not open data); Home owner grant, Province of BC (summarised in our words, read 2026-10-04).

Area I is outside the Province's speculation and vacancy tax area, so the tax doesn't apply to a home here. Our summary of the Province's pages, read 2026-10-04. Where the tax applies, and who pays.

The typical home here is the median value owners gave the 2021 census, and the typical household's income is the median for 2020: a home that costs 5.3 years of income took that many years of a typical household's whole income. "Typical" for places its size is the middle of BC's rural electoral areas.

Land for sale nearby

The 5 nearest listings on AcreScout within 25 km of Walhachin, nearest first.

ListingAsking priceSizePer acreAway
6355 Pinecrest DriveKamloops, listed 426 days ago$275,0004.2 acres$65,476 an acre1.1 km
6557 Thompson River Drive WKamloops, listed 195 days ago$299,9005.01 acres$59,860 an acre1.1 km
6288 Ashcroft RoadKamloops, listed 47 days ago$679,0004.87 acres$139,425 an acre1.4 km
6736 Pinecrest DriveKamloops, listed 102 days ago$379,9001.08 acres$351,759 an acre1.9 km
6781 Ashcroft RoadKamloops, listed 82 days ago$64,9991.87 acres$34,759 an acre2.5 km

Distances are straight lines to the listing's pin. Where AcreScout places a listing only roughly, no distance is given, only the place it's near. Per acre is left out under about an acre. Asking prices are what sellers ask, not what land sells for.

Listings: AcreScout, a Buretto site; active listings as of 2026-11-15. Asking prices set by the sellers; not a valuation.

Source: Census of Population 2021, Statistics Canada (Statistics Canada Open Licence).

What you can build Typical for its size

On a lot zoned for a house, the zoning must allow at least a secondary suite or a garden suite (the provincial minimum).

Homes allowed on a house lot (provincial minimum)
a house and a secondary suite or garden suite
Short-term rentals
The Province's principal residence requirement doesn't apply in Area I (list in force from June 1, 2026).
In the farmland reserve (ALR)
9.5% typical rural area: 4%
More on what you can build

In Area I, a zone limited to detached houses must allow at least one secondary suite or detached accessory home (a garden suite or carriage house) next to a house. A floor of 3 or 4 homes applies on rural land only inside an urban containment boundary drawn in a regional growth strategy, and most rural land is outside one. None of it applies on land in an Islands Trust local trust area or under a rural land use bylaw, and in the Agricultural Land Reserve the Commission's limits come first. How many homes you can build on a lot.

The Province's principal residence requirement doesn't apply in Area I (list in force from June 1, 2026), so the provincial rule doesn't limit short-term rentals to the host's home. Local bylaws, including the zone's own rules, can be stricter. Hosts anywhere in BC register each unit with the provincial registry. Short-term rental rules in BC.

Reports for rural lots in Area I name the zone from the Thompson-Nicola Regional District's zoning map.

Shares of the area's land and water, worked out from the Thompson-Nicola Regional District's zoning map (Open Government Licence – Thompson-Nicola Regional District); a bylaw is listed where at least 20 ha and 1% of it lies here. Lots inside a municipality follow its own bylaw. Confirm with the TNRD's planning department before you buy or build.

Check one lot: look up its address for its zone and the share of the lot in each.

The federal boundaries put 137 reserves of 12 First Nations in or beside Area I. On reserve land the First Nation decides land use, not the local zoning bylaw; a report says when a lot is on reserve land or within 500 m of it. Reserve land in BC, by place.

The Thompson-Nicola Regional District's building inspection covers all of Area I (Building Regulations Bylaw No. 2066, 2005): building, adding on, moving or demolishing a building needs a building permit, and the work is inspected. Our reading of the Thompson-Nicola Regional District's own page, checked 2026-10-07. Do you need a building permit on rural land?

The Province maps 14 designated community watersheds, Murray Community Watershed, Cornwall Community Watershed and Intlpam Community Watershed among them, over 6% of Area I: land draining to a licensed drinking-water intake, where logging and roads on Crown land must protect the supply. A report says whether a lot lies in one and whose water it is. Community watersheds in BC, by place.

Check one lot: is it in the ALR? · is the soil good for farming? · is it in a community watershed?

Source: Agricultural Land Reserve polygons, Agricultural Land Commission (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Living here

Emergency care: the nearest emergency department open around the clock is in Kamloops, 47 km away in a straight line. The one nearer, in Ashcroft, keeps set hours (Mon 08:00 - 20:00, and so on).

Homes with 50/10 Mbps internet or faster
49% typical rural area: 81%
Homes with LTE mobile coverage
75%
Nearest emergency department open around the clock
Kamloops, 47 km in a straight line
Fire halls
2 on the Province's list; the nearest 10 km from Walhachin
Buses
no scheduled buses
Licensed child care
1 (1 group facility, 0 family homes)
Crime, weighted for how serious it is
no police service of its own in Statistics Canada's figures: those of the Lytton RCMP detachment (rural) are under More
More on living here

Internet

49% of homes in Area I have 50/10 Mbps or faster recorded, wired or fixed wireless, against 97.6% across BC. 20% have nothing at 25/5 Mbps or faster.

Share of homes hereBC
50/10 Mbps or faster, wired or fixed wireless49%97.6%
50/10 Mbps or faster over a wired line27%96.2%
50/10 Mbps or faster over fixed wireless38%87%
Nothing at 25/5 Mbps or faster20%1.4%
LTE mobile coverage75%99.1%
Homes counted (2021)5572,170,255
Rank in BC, homes without 50/10 Mbps31st of 248 (tied)

This is the service providers report to the federal government (ISED), counted over each area's homes in the 2021 census. It isn't a promise for any address: ask providers whether they serve it and what it costs to connect. Satellite service, which needs only a clear view of the sky, isn't counted. Data released May 2026. What internet can a given lot get?

Source: National Broadband Data (May 2026) and Pseudo-Household Demographic Distribution (2021), Innovation, Science and Economic Development Canada (Open Government Licence – Canada); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Nearest hospital

The nearest hospital on the Province's list (updated 2026-10-01) is Royal Inland Hospital, Kamloops, about 47 km in a straight line from Walhachin. The nearest emergency department on HealthLink BC's list is Interior Health's emergency department in Ashcroft, about 21 km away; hours on HealthLink BC's list: Mon to Sun 08:00 to 20:00. Drop-in and same-day appointments available. The nearest open 24 hours is that hospital. Roads are longer than these straight lines, and a small town's emergency department can close for a shift when it's short of staff: the health authority posts these as service changes. In an emergency, call 9-1-1. How far is the nearest hospital from a property?

Source: Hospitals in BC, HealthLinkBC (Open Government Licence – British Columbia); Emergency Rooms in BC, HealthLinkBC (Open Government Licence – British Columbia).

Fire protection

In Area I, a fire department answers calls only inside the fire protection area its service bylaw sets, so a hall nearby doesn't by itself mean a lot is covered: ask the Thompson-Nicola Regional District which department responds, if any. The Province's list (updated 2026-09-11) has two fire halls in Area I: Ranger Seymour Memorial Fire Hall and Spences Bridge Volunteer Fire Department. The nearest to Walhachin is Savona Volunteer Fire Department, about 10 km away in a straight line. Home insurers ask the road distance to the hall that responds, which can be far longer than the straight line. How far is the nearest fire hall, and what insurers ask

Source: First Responders (fire halls and ambulance stations), GeoBC (Open Government Licence – British Columbia).

Child care

The Province lists 1 licensed group child care facility in Area I. By the ages their operators list, 1 takes preschool children. It takes part in the fee reduction (CCFRI). Family child care homes are counted but not named or mapped, since they are private homes. Many operators list no ages, and the list holds the licensed facilities the Province funds, so a licensed one without that funding isn't on it. A report on a lot names its nearest group facility and counts those within 1 and 2 km; ask each facility about spaces and its wait list.

Source: Child Care Map Data, Child Care Programs and Services (listed 2026-10-11) (Open Government Licence – British Columbia); placed by us in the 2021 census boundary 2026-10-11. Licensed child care in every BC place.

Crime

The Lytton RCMP detachment (rural) reported a crime severity index of 115 in 2025, above BC's 92; up 2% since 2015 (BC unchanged).

Crime severity index, 2025115 (BC 92)
Violent / non-violent index166 / 96 (BC 98 / 91)
Crime severity index, 2015113 (BC 93)
Change since 2015Up 2% (BC unchanged)
Break and enter, per 100,000 people, 2025297 (BC 281)
Theft of a vehicle, per 100,000 people, 202559 (BC 138)
Theft from a vehicle, per 100,000 people, 2025119 (BC 441)
Violent crime, per 100,000 people, 20253,739 (BC 1,531)
All Criminal Code offences (not traffic), per 100,000 people, 20257,656 (BC 6,943)

Inferred: the nearest RCMP rural detachment Statistics Canada publishes figures for, about 23 km away. BC's police boundaries aren't open data, so the detachment that actually polices this place may be another.

The crime severity index weighs each offence by how serious it is (one assault counts for more than several thefts), with Canada in 2006 set at 100. Rates are per 100,000 people living in the police service's area, so places with many visitors, commuters or seasonal homes read high, and in small places a few incidents swing the figures a lot. These are crimes reported to police, not all crime.

Source: Statistics Canada, Table 35-10-0063-01, Crime severity index and weighted clearance rates, police services in British Columbia (Statistics Canada Open Licence); Statistics Canada, Table 35-10-0184-01, Incident-based crime statistics, by detailed violations, police services in British Columbia (Statistics Canada Open Licence).

Water

307 water-supply wells on record; half are deeper than 42 m, and the median tested yield is 79 L/min.

Water-supply wells on record
307; half deeper than 42 m; median tested yield 79 L/min
Rank in BC for well depth
117th of 245 (tied)
More on water

The Province's monitoring records hold groundwater samples from 3 wells in Area I, 2003 to 2024, among them 2 of the Province's observation wells. No well's median passed Health Canada's limits for arsenic, fluoride, manganese, uranium, nitrate or lead. A report names the nearest sampled wells within 10 km of a lot. A neighbouring well isn't your water: test your own. What BC's well water tests for, by place.

Mapped aquifers

9 mapped aquifers lie in Area I, most wells first.

  1. 1Aquifer 133: Cache Creek to Scottie Creekconfined sand and gravel (glacial)48 wells · high productivity
  2. 2Aquifer 134: Cache Creek to north of Maiden Creekunconfined sand and gravel (small stream system)30 wells · high productivity
  3. 3Aquifer 135: Semlin Valleyconfined sand and gravel (glacial)22 wells · high productivity
  4. 4Aquifer 1163: Agate Aquiferconfined sand and gravel (glacial)12 wells · high productivity
  5. 5Aquifer 716: Spences Bridgeunconfined sand and gravel (medium stream system)10 wells · high productivity
  6. 6Aquifer 719: Ashcroft; west side of Thompson Riverunconfined sand and gravel (medium stream system)4 wells · moderate productivity
  7. 7Aquifer 718: Ashcroft; Ashcroft Ranchunconfined sand and gravel (late glacial outwash)3 wells · moderate productivity
  8. 8Aquifer 717: South of Ashcroft; east side of Thompson Riverconfined sand and gravel (glacial)3 wells · high productivity
  9. 9Aquifer 136: Mauvais Rocher Indian Reserve 5unconfined sand and gravel (alluvial or colluvial fan)1 well · high productivity

An aquifer is listed for each place that holds at least a twentieth of it, so a sliver of one at the edge can be left out. Wells and productivity are for the whole aquifer, which can reach well beyond Area I. The province maps aquifers mostly in settled valleys, so a lot outside every outline can still have groundwater. Every mapped aquifer in BC · sampled lakes.

Sampled lakes

4 sampled lakes lie in Area I, largest first.

  1. 1Barnes Lake44.2 hatoo few readings to judge
  2. 2Venables Lake40.2 hatoo few readings to judge
  3. 3Willard Lake18.9 hatoo few readings to judge
  4. 4Blue Earth Lake11.3 hatoo few readings to judge

A lake is listed for each place that holds at least a twentieth of it or 100 ha of it. Clarity is the median summer Secchi depth; the nutrient class is our reading of Carlson's index from phosphorus or chlorophyll, not a provincial rating. Either is given only for a lake with at least 10 summer readings from open water, spread over at least 3 different years, since 2012. Most lakes have never been sampled, so a lake missing here may simply have no record. Every sampled lake in BC.

Source: Groundwater wells (GWELLS), Province of BC (Open Government Licence – British Columbia); Ground Water Aquifers, Water Protection and Sustainability Branch, Province of BC (Open Government Licence – British Columbia); BC Environmental Monitoring Data System (EnMoDS) results, Province of BC (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Climate and sun

No climate station with published normals sits near the height of Area I: the nearest, Red Lake, 24 km away, stands at about 1,162 m, 788 m above its main settled place (about 374 m). There January averages −6.3 °C and July 15.5 °C, with 202 cm of snow a year (1981-2010 normals): the station's climate, not the place's own.

January mean temperature
-6.3 °C*
July mean temperature
15.5 °C*
Yearly precipitation
505 mm*
Yearly snowfall
202 cm*

Winter sun

About 4 h 40 min of possible direct sun on December 21 at Walhachin, against 7 h 40 min on open ground; a lot on a slope or bench can differ by hours: open any lot's report for its own.

On March 21, 11 h 20 min against 12 h; on June 21, 15 h 20 min against 16 h 20 min. Our estimate from the terrain around the point, ground at about 374 m, seen from head height: trees, buildings and cloud aren't counted. On BC's least winter sun ranking (December sun as a share of open ground) it is 43rd of 310 (tied). How winter sun is read.

20° up40° up60° upDec 21 · 4 h 40 minMar 21 · 11 h 20 minJun 21 · 15 h 20 minESESSWW
The skyline from Walhachin, from NRCan's elevation model every 5°, and the sun's path on December 21, March 21 and June 21: solid where the sun clears the hills, dotted where they hide it. Angles are drawn true to scale.
More on climate and sun
1981-2010 normalsRank in BC
January mean temperature-6.3 °C*No figure on record here, so not ranked
July mean temperature15.5 °C*No figure on record here, so not ranked
Yearly precipitation505 mm*
Yearly snowfall202 cm*No snowfall in this station's normals, so not ranked
Wettest day in the station's record to 201040.5 mm of rain and melted snow, June 5, 2004
Most snow in a day in the station's record to 201031 cm, January 29, 2004
Deepest snow on the ground in the station's record to 201077 cm, January 31, 2004

Normals for 1981-2010 at the Red Lake station, about 24 km from Walhachin (of the communities here with a station within 30 km, the one with the most addresses); ECCC has no fuller 1991-2020 set for it. Its normals don't include the frost-free period, days with snow on the ground, days over 30 °C or degree days, so those are left out. * Based on at least 20 or 15 of the 30 years, short of the World Meteorological Organization's standard: treat as a rougher guide. The records are single days measured at the station: the most rain, snow and wind it saw in its record up to 2010 (ECCC's 1981-2010 sets give records over the station's whole history, so some dates are older than 1981). Each is one event, not what to expect in a year, and the lot can get more or less than the station. Elevation matters a lot in BC: a hillside lot can be much colder and snowier than the station. We don't set this station's figures against other places: it's more than 15 km from the place.

Plant hardiness zone: most homes here are in zone 6a (39%); 19% are in 5b, 12% are in 5a, on Natural Resources Canada's 2025 map. Higher numbers are milder winters. What the zones mean.

Solar panels: a south-facing panel tilted at the latitude would make about 990 kWh a year for each kW of panels at Walhachin, about 35 of it in December (estimated from Natural Resources Canada's 1998-2022 sunshine map). An open sky is assumed: the hills, trees and buildings around a lot cut it, and a report sets the lot's own skyline beside it. What solar panels would make in BC.

By the 2050s (2041-2070) at Walhachin, climate models project about 19 more days over 30 °C a year, a longest frost-free run about 35 days longer and about 10 percentage points less of winter's precipitation falling as snow, each against the same models' 1971-2000 (model projections under SSP2-4.5, a middle path for emissions). The models work on a grid of about 9 by 6 km, which averages valley floors with the slopes around them, so their own figures can sit well off a station's normals and aren't comparable with them. Their own figures there: about 36 days over 30 °C a year in 2041-2070 (range 29 to 58 across the models), against about 17 days in 1971-2000; a longest frost-free run of about 180 days (range 160 to 195), against about 145; and about 72% of winter's precipitation falling as snow (range 62% to 76%), against about 82%. The ranges run from the 10th to the 90th percentile of the models' 2041-2070 figures. The 2050s across BC.

Light at night within 1 km of Walhachin: none recorded from space, and darker than about 94% of BC's homes (2024 satellite record). A lot away from the centre can be much darker. How dark are BC's nights?

Lightning: around Walhachin, a cloud-to-ground flash within 10 km on about 6 days a year and 0.14 flashes per km² a year, more than at 3 in 4 BC homes (the Canadian Lightning Detection Network, 1998-2025 average, on a grid of about 11 by 7 km).

Source: Canadian Climate Normals 1991-2020 and 1981-2010, Environment and Climate Change Canada (Open Government Licence – Canada); Plant hardiness zones of Canada (2025 map), Natural Resources Canada (Open Government Licence – Canada); Medium Resolution Digital Elevation Model (MRDEM-30), Natural Resources Canada (Open Government Licence – Canada); Solar position: General Solar Position Calculations (NOAA Global Monitoring Laboratory; Spencer, 1971) (Public domain); Daily average solar irradiance on tilted surfaces for all of Canada (1998-2022), Natural Resources Canada (Open Government Licence – Canada); Photovoltaic Potential and Solar Resource Maps of Canada (performance ratio), Natural Resources Canada (Open Government Licence – Canada); Statistically downscaled climate indices from CMIP6 global climate models (CanDCS-M6), Environment and Climate Change Canada and the Pacific Climate Impacts Consortium, via the Canadian Centre for Climate Services (Open Government Licence – Canada); VIIRS Nighttime Lights, 2024 annual composite, Earth Observation Group, Payne Institute for Public Policy, Colorado School of Mines (Elvidge et al. 2021, Remote Sensing 13(5):922), via Hengl, OpenGeoHub, Zenodo doi 10.5281/zenodo.7750174 (CC BY 4.0); Canadian Lightning Detection Network cloud-to-ground flashes (CanCPLDv1), Environment and Climate Change Canada (Open Government Licence – Canada).

Land use around

3 major projects in assessment or approved in or near Area I on the Environmental Assessment Office's register; 30% of its land is under mineral, placer or coal titles.

Major projects in assessment or approved, in or within 5 km
3: Highland Solar and Energy Storage; Kwoiek Creek Hydroelectric; Cache Creek Landfill Extension
Under mineral, placer or coal titles
30%
Who holds them
Largest company holders: Talisker Resources Ltd. (32% of the land under title), Teck Highland Valley Copper Corporation (17%), Metal Energy Corp. (9.6%); private individuals hold titles over 11% of it, on the Province's record as of October 29, 2026.
More on land use around

Major projects in Area I

The Environmental Assessment Office's register places 3 major projects in assessment or approved in Area I or within 5 km of it: Highland Solar and Energy Storage (power plant, in assessment (early engagement)); Kwoiek Creek Hydroelectric (power plant, certificate issued Mar 12, 2009, operating); Cache Creek Landfill Extension (local government solid waste management facility, certificate issued Jan 6, 2010, under construction).

ProjectDecisionPhaseWhere
Highland Solar and Energy StoragePower PlantsIn ProgressEarly EngagementIn Area I
Kwoiek Creek HydroelectricPower PlantsCertificate Issued, Mar 12, 2009Post Decision – OperationIn Area I
Cache Creek Landfill ExtensionLocal Government Solid Waste Management FacilitiesCertificate Issued, Jan 6, 2010Post Decision – ConstructionAbout 510 m outside
Closed: 4 withdrawn, terminated, refused, expired or not reviewable

Major projects are those large enough to need a provincial environmental assessment: mines, power plants, pipelines, transmission lines, highways, ports and resorts. The register places each at one point; a mine, pipeline or line can reach well past it, so check the project's own page for its maps. A property report lists those within 10 km of a lot; every project in BC by place.

Source: Environmental Assessment Office project points (EPIC), Province of BC, as of 2026-11-02 (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

The BC Energy Regulator maps about 36 km of active oil and gas pipeline in Area I, permitted to FortisBC Energy Inc. Under a kilometre is abandoned or deactivated, often still in the ground. A report lists any pipeline within 200 m of a lot, and flags one within 30 m, where digging needs the permit holder's agreement. Pipelines in BC, by place.

The Province lists 6 active waste discharge authorizations in Area I; the commonest kinds: composting site (3), roofing plant (1) and soil amendment (biosolids or other wastes spread on land) (1). Of these, 4 may discharge to air and 1 effluent to water or land. A report lists any within 2 km of a lot, and flags one whose point is on it. Permitted discharges in BC, by place.

The Province maps 2 open gravel pits and quarries in Area I: Casadio Quarry and Walhachin Ballast Quarry; and 6 other open mine permits: 4 mineral exploration permit areas and 2 mineral exploration or mine permit areas. A report lists the permits within 2 km of a lot, names an open pit or quarry within 500 m and flags one whose permit area takes in the lot. Gravel pits and mine permits in BC, by place.

On ParcelMap BC, the land in Area I is 3% private, 18% Crown land with a parcel drawn (17% with no title), 1% federal; no parcel is mapped over 78%, likely most of it untitled Crown land, with lakes and road allowances. A report says who owns the land along a lot's line. Crown land next to a property, and every place's land by owner.

The Ministry of Forests maps 41 active Crown range tenures (41 grazing) reaching into Area I, over 44% of its area, licensed for about 41,717 animal unit months of grazing a year in all. Outside a pound district, keeping livestock off a lot is the owner's fence to build. A report lists any tenure within 1 km of a lot. Open range and grazing in BC, by place.

The Province maps 23 registered traplines over 98% of the area and 4 guide outfitter territories over 35% in Area I. The maps are drawn over titled land too, but traplines are registered on Crown land: on titled land, anyone but the owner or occupier needs their written permission to trap. A report says whether either takes in a lot. Traplines and guiding territories in BC, by place.

Area I lies in wildlife management units 3-17 (32%), 3-16 (23%), 3-18 (17%), 3-13 (8%), 3-30 (7%), 3-15 (7%): the Hunting and Trapping Regulations Synopsis sets seasons and closed areas by unit. Hunting and shooting on your own property.

BC Parks maps 18 parks and protected areas (Arrowstone Park, a provincial park; Bedard Aspen Park, a provincial park; Blue Earth Lake Park, a provincial park; Cornwall Hills Park, a provincial park; and 14 more) reaching into Area I, over 21% of its land. Recreation Sites and Trails BC lists 9 sites there. A report names the nearest park and recreation site within 25 km of a lot. Parks and recreation sites in BC, by place.

Check one lot: is there a mineral claim? · power lines nearby? · pipelines nearby? · a gravel pit nearby? · a landfill or plant nearby? · logging planned nearby? · cattle on open range? · is there a trapline? · can I hunt on it? · a park nearby? · Crown land next door?

Source: Mineral, placer and coal tenures, Mineral Titles Branch (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

People

1,038 people in 2021, down 17.7% from 2016; the median age is 55.2.

HereBC
Population, 20211,0385,000,879
Change since 2016-17.7%+7.6%
Median age55.242.8
Under 1512.6%14.3%
65 and over34.3%20.3%
Median household income (2020)$65,500$85,000
Homes owned by the people living in them89.2%66.8%
Single-detached houses84.1%42.4%
Movable dwellings (mobile homes and the like)13.6%2.5%
Built before 196112.9%12.5%
Needing major repairs19.4%5.8%
Median home value (owners' estimate)$348,000$785,000
Median monthly rent$715$1,370
Worked from home18.4%22.6%
Unemployment rate10.3%8.4%

Bars: the dark bar is this place, the red mark is BC.

Who lives here

HereBC
Indigenous identity9.8%5.9%
Immigrants14.4%29.0%
Visible minority4.7%34.4%
No religion or a secular outlook56.0%52.1%

Census figures, shown for context like the others. We don't rank or score places on these.

More on people

Census figures are from 2021; the next census results start in 2027. Area boundaries are Statistics Canada's census subdivisions, which follow municipal and electoral area lines. The places named at the top are the official place names in the area (BC Geographical Names) with the most 2021 homes nearer them than any other name, on ISED's home points: our reading.

Source: Census of Population 2021, Statistics Canada (Statistics Canada Open Licence); BC Geographical Names, Province of BC (Open Government Licence – British Columbia); Pseudo-Household Demographic Distribution (2021), Innovation, Science and Economic Development Canada (Open Government Licence – Canada).