PlaceDossier / Questions

Is a mine, pipeline or other major project planned near my property?

Projects big enough for a provincial environmental assessment are on the Environmental Assessment Office's register, and a report lists those within 10 km of the lot.

Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.

Share

TextEmail

Text and Email open your messages or email app with this message, ready to edit.

What the answer means

A report lists those in assessment or approved within 10 km of the lot line, and flags one in assessment or being built within 1 km.

What the register covers
A project needs a provincial environmental assessment when it passes a size set in the Reviewable Projects Regulation, among them: a new mineral mine producing 75,000 tonnes of ore a year or more, a sand and gravel pit of 500,000 tonnes a year, a power plant of 50 MW, a dam 15 m high, a transmission line of 345 kV and 40 km on new ground, 20 km of new paved highway on new ground, a landfill of 250,000 tonnes a year, and LNG and other energy storage. The minister can also designate a smaller project that isn't substantially started, and anyone can apply for that.
What isn't on it
Smaller works: most gravel pits, quarries, subdivisions, rezonings, cell towers and logging. Logging is in the report's planned cutblocks, local development applications are listed within 200 m where the council publishes them, and Crown land applications within 1 km.
In assessment
The EAO is assessing the project, in phases from early engagement to the application's review, and each phase can take months or years. A project can be withdrawn or refused, and many are. Each assessment has public comment periods, open to anyone, announced on the project's page.
Approved
A certificate has been issued (or the project was approved before the current Act), with conditions the holder must meet. The phase then says whether it's not yet built, under construction, operating or paused. Each certificate sets a deadline, up to 10 years after it's issued, by which the project must be substantially started; the holder can apply to extend it.
One point per project
The register places each project at a single point. A mine's pits, a pipeline, a transmission line or a highway can reach many kilometres past it, so a project listed 8 km away can still run beside the lot, and one placed further away can reach it. The project's page has its maps.

The register gives one point for each project and its own phase and decision, which can lag what's happening on the ground; distances are measured to that point.

Source: Environmental Assessment Office project points (EPIC), Province of BC (Open Government Licence – British Columbia); Reviewable Projects Regulation, B.C. Reg. 243/2019 (thresholds summarised in our words, read 2026-10-06); Environmental Assessment Act, SBC 2018, c. 51, ss. 11 and 31 (summarised in our words, read 2026-10-06); Environmental Assessment Office project information (EPIC) (each project's own page, linked).

Decisions year by year since 1995

The register's decision dates start in 1995. From then to 2026, it dates a decision for 304 projects: 141 given a certificate or approved, the rest found to need no assessment, withdrawn, ended, refused or expired. The busiest year was 2016, with 35, 25 of them withdrawn, ended, refused or expired. 50 projects on the register carry no decision date: 47 still in assessment, so not decided yet, and 3 others (a withdrawal, a terminated assessment and an exemption order) the register gives no date for. They aren't drawn.

Projects decided each year, 1995 to 2026, by the decision the register holds
  • Certificate issued or approved
  • No assessment needed
  • Withdrawn, ended, refused or expired

Point at a year for its decisions; open it to list the projects.

Each bar is one year, counting the projects whose decision the register dates to it. The register holds one decision for each project, its latest, so a certificate that later expired counts as expired, at the date the register gives. The 8 projects approved before the Environmental Assessment Act all carry the date Jun 30, 1995.

Across BC

The register holds 354 projects: 47 in assessment and 141 approved and not complete. The other 166 are closed: found to need no assessment, withdrawn, terminated, refused, expired or complete. Each is listed below with the places it's in or within 5 km of; each name opens the project's EAO page.

In assessment (47)

ProjectDecisionPhasePlaces
Aley MineMineral MinesIn ProgressPre-ApplicationPeace River, Electoral Area B
Arctos AnthraciteCoal MinesIn ProgressPre-ApplicationStikine Region
Aspen Solar and Energy StoragePower PlantsIn ProgressEarly EngagementOkanagan-Similkameen, Electoral Area H
Baptiste NickelMineral MinesIn ProgressEarly EngagementBulkley-Nechako, Electoral Area C
Berg CopperMineral MinesIn ProgressEarly EngagementBulkley-Nechako, Electoral Area G, Bulkley-Nechako, Electoral Area E
Bingay Main CoalCoal MinesIn ProgressPre-ApplicationEast Kootenay, Electoral Area A, Elkford
Carbon Creek Coal MineCoal MinesIn ProgressPre-ApplicationPeace River, Electoral Area E
Chasm Solar and Energy StoragePower PlantsIn ProgressEarly EngagementThompson-Nicola, Electoral Area E (Bonaparte Plateau), Clinton
Crown Mountain Coking CoalCoal MinesIn ProgressApplication Development and ReviewEast Kootenay, Electoral Area A, Sparwood
Dawson Creek Water Supply SystemWater DiversionIn ProgressEarly EngagementPeace River, Electoral Area D, Peace River, Electoral Area C, Taylor, Peace River, Electoral Area E
Fording River Extension Project (Castle)Coal MinesIn ProgressApplication Development and ReviewEast Kootenay, Electoral Area A, Elkford
Fraser River Tunnel ProjectPublic HighwaysIn ProgressEffects AssessmentRichmond, Delta
Frontier ProjectNatural Gas Processing PlantsIn ProgressEarly EngagementPeace River, Electoral Area E
GCT Deltaport Expansion - Berth FourMarine Port ProjectsIn ProgressApplication Development and ReviewDelta, Metro Vancouver, Electoral Area A
Gething CoalCoal MinesIn ProgressPre-ApplicationPeace River, Electoral Area E, Hudson's Hope
Gibraltar Copper-Molybdenum Mine ExpansionMineral MinesIn ProgressOtherCariboo, Electoral Area D, Cariboo, Electoral Area A, Cariboo, Electoral Area F
Hawkeye Energy Corporation Green Energy GridPower PlantsIn ProgressPre-Applicationqathet, Electoral Area A
Highland Solar and Energy StoragePower PlantsIn ProgressEarly EngagementThompson-Nicola, Electoral Area I (Blue Sky Country), Logan Lake
Isle Pierre WindPower PlantsIn ProgressPre-ApplicationFraser-Fort George, Electoral Area C, Bulkley-Nechako, Electoral Area F
Jordan Solar and Energy StoragePower PlantsIn ProgressEarly EngagementJuan de Fuca (Part 2), Juan de Fuca (Part 1)
Kinskuch HydroPower PlantsIn ProgressPre-ApplicationKitimat-Stikine, Electoral Area A
Kinskuch HydroelectricPower PlantsIn ProgressPre-ApplicationKitimat-Stikine, Electoral Area A
Klinaklini HydroelectricPower PlantsIn ProgressPre-ApplicationMount Waddington, Electoral Area A
KutchoMineral MinesIn ProgressProcess PlanningStikine Region
Kwispaa LNGNatural Gas Processing PlantsIn ProgressPre-ApplicationAlberni-Clayoquot, Electoral Area A
Lawyers-Ranch ProjectMineral MinesIn ProgressOtherPeace River, Electoral Area B
m.ah a temEEwuh Solar ProjectPower PlantsIn ProgressReadiness DecisionThompson-Nicola, Electoral Area J (Copper Desert Country), Logan Lake
Michel CoalCoal MinesIn ProgressPre-ApplicationEast Kootenay, Electoral Area A, Sparwood
More Creek HydroelectricPower PlantsIn ProgressPre-ApplicationKitimat-Stikine, Electoral Area D
New Polaris Gold MineMineral MinesIn ProgressApplication Development and ReviewStikine Region
North Island Mine ProjectMineral MinesIn ProgressEarly EngagementMount Waddington, Electoral Area B, Mount Waddington, Electoral Area C
Pacific Northern Gas LoopingTransmission PipelinesIn ProgressPre-ApplicationPeace River, Electoral Area B
Record RidgeMineral MinesIn ProgressProject DesignationKootenay Boundary B / Lower Columbia-Old-Glory
Red Willow WindPower PlantsIn ProgressProcess PlanningPeace River, Electoral Area D
Rocky Creek Metallurgical CoalCoal MinesIn ProgressEarly EngagementPeace River, Electoral Area E
Ruddock Creek MineMineral MinesIn ProgressPre-ApplicationThompson-Nicola, Electoral Area B (Thompson Headwaters), Columbia-Shuswap, Electoral Area B
Ryan River HydroPower PlantsIn ProgressPre-ApplicationSquamish-Lillooet, Electoral Area C
Sechelt CarbonateSand and Gravel PitsIn ProgressPre-ApplicationSunshine Coast, Electoral Area B, Sunshine Coast, Electoral Area A
South Anderson Mountain ResortResort DevelopmentsIn ProgressEarly EngagementFraser Valley, Electoral Area B
Spanish Mountain Gold ProjectMineral MinesIn ProgressEarly EngagementCariboo, Electoral Area F
Summit Lake PG LNGNatural Gas Processing PlantsIn ProgressEarly EngagementFraser-Fort George, Electoral Area G, Fraser-Fort George, Electoral Area A
Sundance WindPower PlantsIn ProgressProcess PlanningPeace River, Electoral Area E
TenasCoal MinesIn ProgressApplication Development and ReviewBulkley-Nechako, Electoral Area A
Tranquille on the LakeResort DevelopmentsIn ProgressOtherKamloops, Thompson-Nicola, Electoral Area J (Copper Desert Country)
Wonowon LandfillHazardous Waste ManagementIn ProgressOtherPeace River, Electoral Area B
Yellowhead Copper ProjectMineral MinesIn ProgressProcess PlanningThompson-Nicola, Electoral Area A (Wells Gray Country), Thompson-Nicola, Electoral Area O (Lower North Thompson)
Zincton All-Season ResortSki ResortsIn ProgressProject DesignationCentral Kootenay, Electoral Area D, Central Kootenay, Electoral Area H
Approved (141)
ProjectDecisionPhasePlaces
AngusConstruction Stone and Industrial Mineral QuarriesCertificate Issued, Jul 13, 2026Post Decision – Pre-ConstructionFraser-Fort George, Electoral Area G, Fraser-Fort George, Electoral Area F
Babkirk Secure LandfillHazardous Waste FacilitiesCertificate Issued, Dec 3, 2008Post Decision – OperationPeace River, Electoral Area B
Babkirk Special Waste Treatment FacilityHazardous Waste FacilitiesCertificate Issued, May 5, 1998Post Decision – Care & MaintenancePeace River, Electoral Area B
Baldy Ridge ExtensionCoal MinesCertificate Issued, Sep 19, 2016Post Decision – AmendmentSparwood, East Kootenay, Electoral Area A
Basal Aquifer DewateringGroundwater ExtractionCertificate Issued, Aug 14, 2002Post Decision – AmendmentLogan Lake
Bear Mountain Wind ParkPower PlantsRegulatory Transfer, Aug 20, 2007Post Decision – Transfer of Certificate/OrderPeace River, Electoral Area D
Bevan Avenue Wells Groundwater Supply DevelopmentGroundwater ExtractionCertificate Issued, May 11, 2011Post Decision – OperationAbbotsford
Big Silver Creek WaterpowerPower PlantsCertificate Issued, Aug 17, 2012Post Decision – OperationFraser Valley, Electoral Area C
Blackwater GoldMineral MinesCertificate Issued, Jun 21, 2019Post Decision – ConstructionCariboo, Electoral Area I
Bodie Waste DumpCoal MinesCertificate Issued, Feb 23, 1996Post Decision – Care & MaintenanceSparwood, East Kootenay, Electoral Area A
Boundary Lake Sour Gas PlantNatural Gas Processing PlantsPre-EA Act Approval, Jun 30, 1995Post Decision – OperationPeace River, Electoral Area B
Brilliant Powerplant ExpansionPower PlantsCertificate Issued, Oct 16, 2001Post Decision – OperationCastlegar, Central Kootenay, Electoral Area I, Central Kootenay, Electoral Area J
Brucejack MineMineral MinesCertificate Issued, Mar 26, 2015Post Decision – OperationKitimat-Stikine, Electoral Area A
Brule MineCoal MinesCertificate Issued, Jul 4, 2006Post Decision – OperationPeace River, Electoral Area E
Bulrush Natural Gas Production and Processing FacilityNatural Gas Processing PlantsCertificate Issued, Dec 22, 1995Post Decision – OperationPeace River, Electoral Area B
Burnaby Lake Rejuvenation ProgramShoreline ModificationCertificate Issued, Sep 25, 2002Post Decision – OperationBurnaby, New Westminster, Coquitlam
Cabin Gas PlantNatural Gas Processing PlantsCertificate Issued, Jan 28, 2010Post Decision – OperationNorthern Rockies
Cache Creek Landfill ExtensionLocal Government Solid Waste Management FacilitiesCertificate Issued, Jan 6, 2010Post Decision – ConstructionCache Creek, Thompson-Nicola, Electoral Area I (Blue Sky Country)
Canada Line Rapid TransitRailwaysCertificate Issued, Jun 7, 2005Post Decision – OperationRichmond, Vancouver
Cape Scott Wind FarmPower PlantsCertificate Issued, Sep 21, 2004Post Decision – OperationMount Waddington, Electoral Area B
Cariboo Gold ProjectMineral MinesCertificate Issued, Oct 10, 2023Post Decision – ConstructionWells, Cariboo, Electoral Area C
Caribou Gas Processing PlantPower PlantsCertificate Issued, Nov 13, 1996Post Decision – Care & MaintenancePeace River, Electoral Area B
Cedar LNGNatural Gas Processing PlantsCertificate Issued, Mar 13, 2023Post Decision – Pre-ConstructionKitimat
Chemainus Wells ProjectGroundwater ExtractionCertificate Issued, Mar 9, 2009Post Decision – OperationNorth Cowichan, Cowichan Valley, Electoral Area D, Cowichan Valley, Electoral Area G
Coastal GasLink PipelineTransmission PipelinesCertificate Issued, Oct 23, 2014Post Decision – ConstructionPeace River, Electoral Area E
Cougar South/Main Pits and West Spoil CoalCoal MinesCertificate Issued, Apr 10, 1997OtherElkford, East Kootenay, Electoral Area A
Coursier Dam DecommissioningPower PlantsCertificate Issued, May 8, 2003Post Decision – DecommissionColumbia-Shuswap, Electoral Area B, Central Kootenay, Electoral Area K
Cranbrook Deep WellsGroundwater ExtractionCertificate Issued, Oct 15, 2004Post Decision – OperationCranbrook, East Kootenay, Electoral Area C
Deltaport Third BerthMarine Port FacilitiesCertificate Issued, Sep 28, 2006Post Decision – OperationDelta, Metro Vancouver, Electoral Area A
District of Chilliwack Groundwater WellGroundwater ExtractionCertificate Issued, Nov 23, 1998Post Decision – OperationChilliwack, Fraser Valley, Electoral Area H, Fraser Valley, Electoral Area E
Dokie Wind EnergyPower PlantsCertificate Issued, Aug 8, 2006Post Decision – OperationPeace River, Electoral Area E
Eagle Mountain - Woodfibre Gas PipelineTransmission PipelinesCertificate Issued, Aug 9, 2016Post Decision – Pre-ConstructionMetro Vancouver, Electoral Area A
East Toba River Montrose Creek HydroelectricPower PlantsCertificate Issued, Apr 24, 2007Post Decision – Operationqathet, Electoral Area A
Elkhorn Quarry ExtensionSand and Gravel PitsCertificate Issued, Sep 19, 1995OtherEast Kootenay, Electoral Area F
Eskay Creek MineMineral MinesPre-EA Act Approval, Jun 30, 1995Post Decision – Care & MaintenanceKitimat-Stikine, Electoral Area A, Kitimat-Stikine, Electoral Area D
Eskay Creek RevitalizationMineral MinesCertificate Issued, Jan 26, 2026Post Decision – AmendmentKitimat-Stikine, Electoral Area A, Kitimat-Stikine, Electoral Area D
Evergreen Line Rapid TransitRailwaysCertificate Issued, Feb 2, 2011Post Decision – OperationLangley (district municipality), Maple Ridge
Fiberco Pulp Mill ExpansionForest Products IndustriesCertificate Issued, Jan 25, 1996Post Decision – Pre-ConstructionTaylor, Peace River, Electoral Area C, Peace River, Electoral Area D, Peace River, Electoral Area E
Fording River Operations SwiftCoal MinesCertificate Issued, Sep 10, 2015Post Decision – OperationEast Kootenay, Electoral Area A, Elkford
Forrest Kerr HydroelectricPower PlantsCertificate Issued, Mar 13, 2003Post Decision – OperationKitimat-Stikine, Electoral Area D
Fort Nelson Electrical GenerationPower PlantsCertificate Issued, Sep 25, 1998Post Decision – OperationNorthern Rockies
Galore Creek Copper-Gold-SilverMineral MinesCertificate Issued, Feb 16, 2007Post Decision – Care & MaintenanceKitimat-Stikine, Electoral Area D
Giscome Quarry and Lime PlantConstruction Stone and Industrial Mineral QuarriesCertificate Issued, Dec 14, 2016Post Decision – ExtensionFraser-Fort George, Electoral Area F
Hart Water Supply Improvements Fishtrap Island Collector WellGroundwater ExtractionCertificate Issued, Feb 26, 2004Post Decision – OperationPrince George, Fraser-Fort George, Electoral Area A
Highland Valley Copper Mine Life ExtensionMineral MinesCertificate Issued, Jun 17, 2025Post Decision – Pre-ConstructionLogan Lake
Highway Gas and Liquids Plant and PipelinePower PlantsCertificate Issued, Feb 6, 1997Post Decision – OperationPeace River, Electoral Area B
Holberg Wind EnergyPower PlantsCertificate Issued, Oct 22, 2004Post Decision – Pre-ConstructionMount Waddington, Electoral Area B
Huckleberry Copper and Gold MineMineral MinesCertificate Issued, Dec 22, 1995Post Decision – Care & MaintenanceBulkley-Nechako, Electoral Area E
Interior-Lower Mainland TransmissionElectric Transmission LinesCertificate Issued, Jun 3, 2009Post Decision – OperationThompson-Nicola, Electoral Area M (Beautiful Nicola Valley - North)
Island CogenerationEnergy Storage FacilitiesCertificate Issued, Apr 9, 1998Post Decision – OperationCampbell River, Strathcona, Electoral Area C, Strathcona, Electoral Area A
James White Park WellsGroundwater ExtractionCertificate Issued, Nov 4, 2015Post Decision – OperationFernie, East Kootenay, Electoral Area A, East Kootenay, Electoral Area B
Jedney Gas Plant & Pipeline ExpansionNatural Gas Processing PlantsCertificate Issued, Feb 18, 1997Post Decision – OperationPeace River, Electoral Area B
Jedney Gas Processing Plant and Pipeline FacilitiesNatural Gas Processing PlantsCertificate Issued, Apr 25, 1996Post Decision – OperationPeace River, Electoral Area B
Kamloops GroundwaterGroundwater ExtractionCertificate Issued, Apr 13, 2004Post Decision – Care & MaintenanceKamloops
Keenleyside PowerplantPower PlantsCertificate Issued, Apr 27, 1998Post Decision – OperationCastlegar, Central Kootenay, Electoral Area J
Kemess SouthMineral MinesCertificate Issued, Apr 29, 1996Post Decision – DecommissionPeace River, Electoral Area B
Kemess UndergroundMineral MinesCertificate Issued, Mar 13, 2017Post Decision – ConstructionPeace River, Electoral Area B
Kerr-Sulpherets-Mitchell (KSM)Mineral MinesCertificate Issued, Jul 29, 2014Post Decision – Pre-ConstructionKitimat-Stikine, Electoral Area A
Kitimat LNG TerminalEnergy Storage FacilitiesCertificate Issued, Jun 1, 2006Post Decision – Care & MaintenanceKitimat
Kitsault MineMineral MinesCertificate Issued, Mar 18, 2013Post Decision – Care & MaintenanceKitimat-Stikine, Electoral Area A
Kokish River HydroelectricPower PlantsCertificate Issued, Nov 24, 2011Post Decision – OperationMount Waddington, Electoral Area D, Mount Waddington, Electoral Area A
Kootenay West MineConstruction Stone and Industrial Mineral QuarriesCertificate Issued, Jan 24, 2018Post Decision – AmendmentEast Kootenay, Electoral Area F, East Kootenay, Electoral Area E
Ksi Lisims LNGNatural Gas Processing PlantsCertificate Issued, Sep 15, 2025Post Decision – Pre-ConstructionKitimat-Stikine, Electoral Area A
Kwoiek Creek HydroelectricPower PlantsCertificate Issued, Mar 12, 2009Post Decision – OperationThompson-Nicola, Electoral Area I (Blue Sky Country)
Lafarge Cement Plant ModernizationNon-metallic Mineral Products IndustriesCertificate Issued, Sep 22, 1996Post Decision – OperationRichmond, Delta, Burnaby, New Westminster, Vancouver
Line Creek CoalCoal MinesPre-EA Act Approval, Jun 30, 1995Post Decision – OperationSparwood, East Kootenay, Electoral Area A
Line Creek Operations Phase IICoal MinesCertificate Issued, Sep 25, 2013Post Decision – OperationEast Kootenay, Electoral Area A, Sparwood, Elkford
LNG Canada Export TerminalEnergy Storage FacilitiesCertificate Issued, Jun 17, 2015Post Decision – ConstructionKitimat
Maxhamish PipelineTransmission PipelinesCertificate Issued, Dec 7, 1999Post Decision – OperationNorthern Rockies
McGillivray CoalCoal MinesCertificate Issued, Jul 24, 1996Post Decision – DecommissionEast Kootenay, Electoral Area A, Sparwood
McLymont Creek HydroelectricPower PlantsCertificate Issued, May 31, 2012Post Decision – OperationKitimat-Stikine, Electoral Area D
McMahon Co-GenerationPower PlantsPre-EA Act Approval, Jun 30, 1995Post Decision – OperationTaylor, Peace River, Electoral Area D, Peace River, Electoral Area C, Peace River, Electoral Area E
Meikle Wind EnergyPower PlantsCertificate Issued, Jun 24, 2014Post Decision – OperationPeace River, Electoral Area E, Tumbler Ridge
Mica Generating Station Unit 5Power PlantsCertificate Issued, Apr 7, 2010Post Decision – OperationColumbia-Shuswap, Electoral Area B
Mica Generating Station Unit 6Power PlantsCertificate Issued, Apr 7, 2010Post Decision – OperationColumbia-Shuswap, Electoral Area B
Mt. Milligan Copper-GoldMineral MinesCertificate Issued, Mar 16, 2009Post Decision – OperationBulkley-Nechako, Electoral Area C
Mt. Polley CopperMineral MinesPre-EA Act Approval, Jun 30, 1995Post Decision – OperationCariboo, Electoral Area E, Cariboo, Electoral Area F
Murray River CoalCoal MinesCertificate Issued, Oct 1, 2015Post Decision – ExtensionFraser-Fort George, Electoral Area G, Peace River, Electoral Area E
Narrows Inlet HydroPower PlantsCertificate Issued, Jan 15, 2014Post Decision – ConstructionSunshine Coast, Electoral Area B
Nazko Lava Quarry ExtensionSand and Gravel PitsCertificate Issued, Feb 22, 1996Post Decision – OperationCariboo, Electoral Area I
New Fraser River CrossingShoreline ModificationCertificate Issued, Aug 6, 2004Post Decision – OperationMaple Ridge, Langley (district municipality), Pitt Meadows, Metro Vancouver, Electoral Area A, Surrey
North Lakeside WellGroundwater ExtractionCertificate Issued, Oct 24, 2001Post Decision – OperationWilliams Lake, Cariboo, Electoral Area D, Cariboo, Electoral Area F, Cariboo, Electoral Area E
North Montney Mainline PipelineTransmission PipelinesCertificate Issued, Jan 18, 2017Post Decision – OperationPeace River, Electoral Area E
Northeast British Columbia (NEBC) ExpansionTransmission PipelinesCertificate Issued, Aug 9, 2016Post Decision – OperationPeace River, Electoral Area B
Northern Rockies Secure LandfillLocal Government Solid Waste Management FacilitiesCertificate Issued, Mar 31, 2009Post Decision – OperationNorthern Rockies
Northwest Transmission LineElectric Transmission LinesCertificate Issued, Feb 23, 2011Post Decision – OperationKitimat-Stikine, Electoral Area A
Orca Sand and GravelSand and Gravel PitsCertificate Issued, Jul 14, 2005Post Decision – OperationPort McNeill, Mount Waddington, Electoral Area C, Mount Waddington, Electoral Area A
Pattullo Bridge ReplacementShoreline ModificationCertificate Issued, May 2, 2019Post Decision – Pre-ConstructionSurrey, New Westminster, Coquitlam, Delta, Burnaby
Peace Valley Oriented Strand BoardForest Products IndustriesCertificate Issued, Jan 14, 2002Post Decision – OperationFort St. John, Peace River, Electoral Area C, Peace River, Electoral Area E
Peejay Secure LandfillLocal Government Solid Waste Management FacilitiesCertificate Issued, Sep 18, 2008Post Decision – ConstructionPeace River, Electoral Area B
Pingston Creek HydroelectricPower PlantsCertificate Issued, May 18, 1999Post Decision – OperationCentral Kootenay, Electoral Area K, Columbia-Shuswap, Electoral Area B
Port Alberni CogenerationPower PlantsCertificate Issued, Dec 10, 1999Post Decision – Pre-ConstructionPort Alberni, Alberni-Clayoquot, Electoral Area D, Alberni-Clayoquot, Electoral Area F, Alberni-Clayoquot, Electoral Area E, Alberni-Clayoquot, Electoral Area B
Port Mann/Highway 1Public HighwaysCertificate Issued, Jun 12, 2008Post Decision – OperationSurrey, Coquitlam, Port Coquitlam, Pitt Meadows, New Westminster
Prince Rupert Gas Transmission (PRGT)Transmission PipelinesCertificate Issued, Nov 25, 2014Post Decision – ConstructionFraser-Fort George, Electoral Area G, Mackenzie
Quality WindPower PlantsCertificate Issued, Jul 9, 2010Post Decision – OperationTumbler Ridge, Peace River, Electoral Area D
Red Chris Porphyry Copper-Gold MineMineral MinesCertificate Issued, Aug 24, 2005Post Decision – OperationKitimat-Stikine, Electoral Area D
Red Mountain Underground GoldMineral MinesCertificate Issued, Oct 5, 2018Post Decision – Pre-ConstructionKitimat-Stikine, Electoral Area A
Revelstoke Generating Station Unit 5Power PlantsCertificate Issued, May 30, 2007Post Decision – OperationRevelstoke, Columbia-Shuswap, Electoral Area B
Revelstoke Generating Station Unit 6Power PlantsCertificate Issued, Nov 27, 2018Post Decision – ExtensionRevelstoke, Columbia-Shuswap, Electoral Area B
Ridley Island Energy Export Facility (formerly known as Vopak Pacific Canada)Energy Storage FacilitiesCertificate Issued, Apr 20, 2022Post Decision – ConstructionPrince Rupert, Port Edward, North Coast, Electoral Area A, North Coast, Electoral Area C
Ring Border Gas Plant ExpansionEnergy Storage FacilitiesCertificate Issued, Jan 15, 1998Post Decision – OperationPeace River, Electoral Area B
Roberts Bank Terminal 2RailwaysCertificate Issued, Sep 28, 2023Application ReviewDelta, Metro Vancouver, Electoral Area A
Roman Coal MineCoal MinesCertificate Issued, Dec 14, 2012Post Decision – Care & MaintenanceTumbler Ridge
Sea-To-Sky Highway UpgradePublic HighwaysCertificate Issued, Jun 4, 2004Post Decision – OperationSquamish-Lillooet, Electoral Area D
Seven Mile Generating Station Unit 4Power PlantsCertificate Issued, Apr 25, 1996Post Decision – OperationKootenay Boundary, Electoral Area A, Central Kootenay, Electoral Area G
Silverberry Secure LandfillLocal Government Solid Waste Management FacilitiesCertificate Issued, Jul 10, 2002Post Decision – OperationPeace River, Electoral Area B
Site C Clean EnergyPower PlantsCertificate Issued, Oct 14, 2014Post Decision – ConstructionPeace River, Electoral Area E, Peace River, Electoral Area C, Fort St. John
South Fraser Perimeter RoadPublic HighwaysCertificate Issued, Jul 24, 2008Post Decision – OperationDelta, Surrey, New Westminster, Richmond, Burnaby
Southern Crossing PipelineTransmission PipelinesCertificate Issued, May 21, 1999Post Decision – OperationCentral Kootenay, Electoral Area G
Squamish Groundwater WellGroundwater ExtractionCertificate Issued, Mar 31, 1999Post Decision – OperationSquamish, Squamish-Lillooet, Electoral Area D
Stave Falls PowerplantPower PlantsPre-EA Act Approval, Jun 30, 1995Post Decision – OperationMission
Stewart Bulk Terminals Wharf ExpansionMarine Port FacilitiesCertificate Issued, Oct 9, 2002Post Decision – OperationStewart, Kitimat-Stikine, Electoral Area A
Stronsay Lead/ZincMineral MinesPre-EA Act Approval, Jun 30, 1995Pre-EAPeace River, Electoral Area B
Sulphurets Gold/SilverMineral MinesPre-EA Act Approval, Jun 30, 1995OtherKitimat-Stikine, Electoral Area A
Swamp Point Aggregate MineSand and Gravel PitsCertificate Issued, Jun 21, 2006Post Decision – Care & MaintenanceKitimat-Stikine, Electoral Area A
Taiga Forest Products Lumber Treatment FacilityForest Products IndustriesCertificate Issued, Sep 30, 1997Post Decision – OperationLangley (district municipality), Abbotsford
Taylor Straddle PlantEnergy Storage FacilitiesCertificate Issued, Oct 14, 1997Post Decision – OperationTaylor, Peace River, Electoral Area D, Peace River, Electoral Area C, Peace River, Electoral Area E
Terminal A ExtensionMarine Port FacilitiesCertificate Issued, Dec 17, 2015Post Decision – OperationKitimat
Tilbury Marine JettyMarine Port FacilitiesCertificate Issued, Mar 27, 2024ReferralDelta, Richmond
Tilbury Phase 2 LNG ExpansionEnergy Storage FacilitiesCertificate Issued, Sep 21, 2026Post Decision – Pre-ConstructionDelta, Richmond
Tom MacKay Lake Waste Rock & TailingsShoreline ModificationCertificate Issued, Jul 21, 2000Post Decision – DecommissionKitimat-Stikine, Electoral Area A, Kitimat-Stikine, Electoral Area D
Towerbirch ExpansionTransmission PipelinesCertificate Issued, Feb 23, 2017Post Decision – OperationPeace River, Electoral Area B
Trans Mountain Expansion (TMX)Transmission PipelinesCertificate Issued, Jan 10, 2017Post Decision – OperationKamloops, Thompson-Nicola, Electoral Area J (Copper Desert Country)
Trans Mountain Pipe Line ModificationTransmission PipelinesCertificate Issued, Apr 23, 1997Post Decision – OperationBurnaby, Port Moody, Coquitlam, Metro Vancouver, Electoral Area A, North Vancouver (district municipality), New Westminster, Belcarra
Tretheway Creek WaterpowerPower PlantsCertificate Issued, Aug 17, 2012Post Decision – OperationFraser Valley, Electoral Area C
Tulsequah Chief MineMineral MinesCertificate Issued, Dec 12, 2002Post Decision – Care & MaintenanceStikine Region
Upper Harrison Water PowerPower PlantsCertificate Issued, Sep 21, 2006Post Decision – OperationFraser Valley, Electoral Area C
Upper Lillooet HydroElectric Transmission LinesCertificate Issued, Jan 8, 2013Post Decision – OperationSquamish-Lillooet, Electoral Area C
Upper Toba Valley HydroelectricPower PlantsCertificate Issued, Mar 31, 2009Post Decision – Constructionqathet, Electoral Area A
Vancouver Airport Fuel DeliveryTransmission PipelinesCertificate Issued, Dec 11, 2013Post Decision – ConstructionRichmond, Delta
Vancouver Convention Centre ExpansionShoreline ModificationCertificate Issued, Jul 28, 2004Post Decision – OperationVancouver, North Vancouver (district municipality), North Vancouver (city), West Vancouver, Metro Vancouver, Electoral Area A
Vancouver Island GenerationPower PlantsCertificate Issued, Dec 17, 2003Post Decision – Pre-ConstructionNanaimo, Nanaimo, Electoral Area A, Nanaimo, Electoral Area B, Nanaimo, Electoral Area C
Vancouver Island Transmission ReinforcementElectric Transmission LinesCertificate Issued, Feb 12, 2007Post Decision – OperationSouthern Gulf Islands, Saltspring Island
Waneta Generating Station UpgradePower PlantsCertificate Issued, May 26, 1998Post Decision – OperationKootenay Boundary, Electoral Area A, Kootenay Boundary B / Lower Columbia-Old-Glory
Waneta Hydroelectric ExpansionPower PlantsCertificate Issued, Nov 13, 2007Post Decision – OperationKootenay Boundary, Electoral Area A, Kootenay Boundary B / Lower Columbia-Old-Glory
West Stoddart Gas Processing FacilityEnergy Storage FacilitiesCertificate Issued, Apr 23, 1998Post Decision – OperationPeace River, Electoral Area B
Whistler Nordic CentreSki ResortsCertificate Issued, Apr 5, 2005Post Decision – OperationSquamish-Lillooet, Electoral Area D, Squamish-Lillooet, Electoral Area C, Whistler
Willow CreekCoal MinesCertificate Issued, Mar 6, 1998Post Decision – OperationChetwynd, Peace River, Electoral Area E
Wolverine Coal MineCoal MinesCertificate Issued, Jan 14, 2005Post Decision – OperationTumbler Ridge
Woodfibre LNGEnergy Storage FacilitiesCertificate Issued, Oct 26, 2015Post Decision – ConstructionSquamish, Squamish-Lillooet, Electoral Area D
Younger NGL Plant ExpansionEnergy Storage FacilitiesCertificate Issued, Jun 11, 1996Post Decision – OperationTaylor, Peace River, Electoral Area C, Peace River, Electoral Area D, Peace River, Electoral Area E

Places are where the EAO's single point for the project lies, in the place or within 5 km of its outline; a mine, pipeline or line can reach places it isn't listed under. A property report measures from the lot line to each project within 10 km.

Source: Environmental Assessment Office project points (EPIC), Province of BC, as of 2026-11-02 (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Every permitted oil and gas pipeline, large or small, is on the BC Energy Regulator's map, which a report reads too: see pipelines near a property. Most gravel pits, quarries and placer and exploration permits are on the Province's map of Mines Act permits: see gravel pits near a property. When a project needs private land, the Expropriation Act sets the notice and the payment: see expropriation.

Buying rural land? Before you buy rural land in BC: the nine questions that decide an offer, on one printable page.