PlaceDossier / Questions

Is a mine, pipeline or other major project planned near my property?

Projects big enough for a provincial environmental assessment are on the Environmental Assessment Office's register, and a report lists those within 10 km of the lot.

Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.

Share

TextEmail

Text and Email open your messages or email app with this message, ready to edit.

What the answer means

A report lists those in assessment or approved within 10 km of the lot line, and flags one in assessment or being built within 1 km.

What the register covers
A project needs a provincial environmental assessment when it passes a size set in the Reviewable Projects Regulation, among them: a new mineral mine producing 75,000 tonnes of ore a year or more, a sand and gravel pit of 500,000 tonnes a year, a power plant of 50 MW, a dam 15 m high, a transmission line of 345 kV and 40 km on new ground, 20 km of new paved highway on new ground, a landfill of 250,000 tonnes a year, and LNG and other energy storage. The minister can also designate a smaller project that isn't substantially started, and anyone can apply for that.
What isn't on it
Smaller works: most gravel pits, quarries, subdivisions, rezonings, cell towers and logging. Logging is in the report's planned cutblocks, local development applications are listed within 200 m where the council publishes them, and Crown land applications within 1 km.
In assessment
The EAO is assessing the project, in phases from early engagement to the application's review, and each phase can take months or years. A project can be withdrawn or refused, and many are. Each assessment has public comment periods, open to anyone, announced on the project's page.
Approved
A certificate has been issued (or the project was approved before the current Act), with conditions the holder must meet. The phase then says whether it's not yet built, under construction, operating or paused. Each certificate sets a deadline, up to 10 years after it's issued, by which the project must be substantially started; the holder can apply to extend it.
One point per project
The register places each project at a single point. A mine's pits, a pipeline, a transmission line or a highway can reach many kilometres past it, so a project listed 8 km away can still run beside the lot, and one placed further away can reach it. The project's page has its maps.

The register gives one point for each project and its own phase and decision, which can lag what's happening on the ground; distances are measured to that point.

Source: Environmental Assessment Office project points (EPIC), Province of BC (Open Government Licence – British Columbia); Reviewable Projects Regulation, B.C. Reg. 243/2019 (thresholds summarised in our words, read 2026-10-06); Environmental Assessment Act, SBC 2018, c. 51, ss. 11 and 31 (summarised in our words, read 2026-10-06); Environmental Assessment Office project information (EPIC) (each project's own page, linked).

Decisions year by year since 1995

13 projects on the register have a decision dated 2018. They're listed below in place of the projects in assessment and approved.

Projects decided each year, 1995 to 2026, by the decision the register holds

Showing projects decided in 2018 Show the projects in assessment and approved

  • Certificate issued or approved
  • No assessment needed
  • Withdrawn, ended, refused or expired

Showing 2018. Point at another year, or open it.

Each bar is one year, counting the projects whose decision the register dates to it. The register holds one decision for each project, its latest, so a certificate that later expired counts as expired, at the date the register gives. The 8 projects approved before the Environmental Assessment Act all carry the date Jun 30, 1995.

Decided in 2018

13 projects on the register have a decision dated 2018: 3 given a certificate or approved, 5 found to need no assessment and 5 withdrawn, ended, refused or expired. Each is listed with the places it's in or within 5 km of, and its phase now. Every project in assessment or approved.

Certificate issued or approved (3)

ProjectDecisionPhasePlaces
Kootenay West MineConstruction Stone and Industrial Mineral QuarriesCertificate Issued, Jan 24, 2018Post Decision – AmendmentEast Kootenay, Electoral Area F, East Kootenay, Electoral Area E
Red Mountain Underground GoldMineral MinesCertificate Issued, Oct 5, 2018Post Decision – Pre-ConstructionKitimat-Stikine, Electoral Area A
Revelstoke Generating Station Unit 6Power PlantsCertificate Issued, Nov 27, 2018Post Decision – ExtensionRevelstoke, Columbia-Shuswap, Electoral Area B

No assessment needed (5)

ProjectDecisionPhasePlaces
Environmental Assessment RevitalizationOtherNot Designated Reviewable, Jun 18, 2018OtherJuan de Fuca (Part 1), Victoria, Oak Bay, Saanich, Esquimalt
Prince Rupert TerminalEnergy Storage FacilitiesNot Designated Reviewable, Jul 16, 2018CompletePrince Rupert, Port Edward, North Coast, Electoral Area A, North Coast, Electoral Area C
Progress Energy Lily DamDamsCertificate Not Required, Jul 16, 2018Post Decision – Care & MaintenancePeace River, Electoral Area B
Progress Energy Town DamDamsCertificate Not Required, Jul 16, 2018Post Decision – OperationPeace River, Electoral Area B
Revelstoke Sand and Gravel PitsSand and Gravel PitsNot Designated Reviewable, Aug 28, 2018CompleteRevelstoke, Columbia-Shuswap, Electoral Area B

Withdrawn, ended, refused or expired (5)

ProjectDecisionPhasePlaces
Grassy Point LNGEnergy Storage FacilitiesWithdrawn, Mar 26, 2018WithdrawalNorth Coast, Electoral Area A
Harper CreekMineral MinesTerminated, Jul 13, 2018TerminationThompson-Nicola, Electoral Area A (Wells Gray Country), Thompson-Nicola, Electoral Area B (Thompson Headwaters), Clearwater
Fortune Creek GasNatural Gas Processing PlantsCertificate Expired, Oct 7, 2018Post Decision – CompleteNorthern Rockies
Hermann MineCoal MinesCertificate Expired, Nov 24, 2018OtherTumbler Ridge
WCC LNGEnergy Storage FacilitiesWithdrawn, Dec 18, 2018WithdrawalPrince Rupert, North Coast, Electoral Area A

The decision and its date are the register's own; the phase is where the project stands now. Places are where the EAO's single point for the project lies; a mine, pipeline or line can reach places it isn't listed under.

Source: Environmental Assessment Office project points (EPIC), Province of BC, as of 2026-11-02 (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Every permitted oil and gas pipeline, large or small, is on the BC Energy Regulator's map, which a report reads too: see pipelines near a property. Most gravel pits, quarries and placer and exploration permits are on the Province's map of Mines Act permits: see gravel pits near a property. When a project needs private land, the Expropriation Act sets the notice and the payment: see expropriation.

Buying rural land? Before you buy rural land in BC: the nine questions that decide an offer, on one printable page.