PlaceDossier / Questions

Is a mine, pipeline or other major project planned near my property?

Projects big enough for a provincial environmental assessment are on the Environmental Assessment Office's register, and a report lists those within 10 km of the lot.

Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.

Share

TextEmail

Text and Email open your messages or email app with this message, ready to edit.

What the answer means

A report lists those in assessment or approved within 10 km of the lot line, and flags one in assessment or being built within 1 km.

What the register covers
A project needs a provincial environmental assessment when it passes a size set in the Reviewable Projects Regulation, among them: a new mineral mine producing 75,000 tonnes of ore a year or more, a sand and gravel pit of 500,000 tonnes a year, a power plant of 50 MW, a dam 15 m high, a transmission line of 345 kV and 40 km on new ground, 20 km of new paved highway on new ground, a landfill of 250,000 tonnes a year, and LNG and other energy storage. The minister can also designate a smaller project that isn't substantially started, and anyone can apply for that.
What isn't on it
Smaller works: most gravel pits, quarries, subdivisions, rezonings, cell towers and logging. Logging is in the report's planned cutblocks, local development applications are listed within 200 m where the council publishes them, and Crown land applications within 1 km.
In assessment
The EAO is assessing the project, in phases from early engagement to the application's review, and each phase can take months or years. A project can be withdrawn or refused, and many are. Each assessment has public comment periods, open to anyone, announced on the project's page.
Approved
A certificate has been issued (or the project was approved before the current Act), with conditions the holder must meet. The phase then says whether it's not yet built, under construction, operating or paused. Each certificate sets a deadline, up to 10 years after it's issued, by which the project must be substantially started; the holder can apply to extend it.
One point per project
The register places each project at a single point. A mine's pits, a pipeline, a transmission line or a highway can reach many kilometres past it, so a project listed 8 km away can still run beside the lot, and one placed further away can reach it. The project's page has its maps.

The register gives one point for each project and its own phase and decision, which can lag what's happening on the ground; distances are measured to that point.

Source: Environmental Assessment Office project points (EPIC), Province of BC (Open Government Licence – British Columbia); Reviewable Projects Regulation, B.C. Reg. 243/2019 (thresholds summarised in our words, read 2026-10-06); Environmental Assessment Act, SBC 2018, c. 51, ss. 11 and 31 (summarised in our words, read 2026-10-06); Environmental Assessment Office project information (EPIC) (each project's own page, linked).

Decisions year by year since 1995

18 projects on the register have a decision dated 2014. They're listed below in place of the projects in assessment and approved.

Projects decided each year, 1995 to 2026, by the decision the register holds

Showing projects decided in 2014 Show the projects in assessment and approved

  • Certificate issued or approved
  • No assessment needed
  • Withdrawn, ended, refused or expired

Showing 2014. Point at another year, or open it.

Each bar is one year, counting the projects whose decision the register dates to it. The register holds one decision for each project, its latest, so a certificate that later expired counts as expired, at the date the register gives. The 8 projects approved before the Environmental Assessment Act all carry the date Jun 30, 1995.

Decided in 2014

18 projects on the register have a decision dated 2014: 6 given a certificate or approved, 4 found to need no assessment and 8 withdrawn, ended, refused or expired. Each is listed with the places it's in or within 5 km of, and its phase now. Every project in assessment or approved.

Certificate issued or approved (6)

ProjectDecisionPhasePlaces
Narrows Inlet HydroPower PlantsCertificate Issued, Jan 15, 2014Post Decision – ConstructionSunshine Coast, Electoral Area B
Meikle Wind EnergyPower PlantsCertificate Issued, Jun 24, 2014Post Decision – OperationPeace River, Electoral Area E, Tumbler Ridge
Kerr-Sulpherets-Mitchell (KSM)Mineral MinesCertificate Issued, Jul 29, 2014Post Decision – Pre-ConstructionKitimat-Stikine, Electoral Area A
Site C Clean EnergyPower PlantsCertificate Issued, Oct 14, 2014Post Decision – ConstructionPeace River, Electoral Area E, Peace River, Electoral Area C, Fort St. John
Coastal GasLink PipelineTransmission PipelinesCertificate Issued, Oct 23, 2014Post Decision – ConstructionPeace River, Electoral Area E
Prince Rupert Gas Transmission (PRGT)Transmission PipelinesCertificate Issued, Nov 25, 2014Post Decision – ConstructionFraser-Fort George, Electoral Area G, Mackenzie

No assessment needed (4)

ProjectDecisionPhasePlaces
Encana 4-26 RefrigerationNatural Gas Processing PlantsCertificate Not Required, Jan 13, 2014OtherPeace River, Electoral Area D
North Thompson Emergency Water IntakeWater DiversionCertificate Not Required, Jun 25, 2014OtherKamloops, Thompson-Nicola, Electoral Area J (Copper Desert Country)
Encana 8-21 RefrigerationNatural Gas Processing PlantsCertificate Not Required, Oct 30, 2014OtherPeace River, Electoral Area D
Progress Town North GasNatural Gas Processing PlantsCertificate Not Required, Nov 10, 2014Post Decision – ConstructionPeace River, Electoral Area B

Withdrawn, ended, refused or expired (8)

ProjectDecisionPhasePlaces
Nascall River HydroelectricPower PlantsWithdrawn, May 13, 2014WithdrawalCentral Coast, Electoral Area A
Mount McDonald Wind PowerPower PlantsWithdrawn, May 21, 2014WithdrawalPort Edward, North Coast, Electoral Area C, North Coast, Electoral Area A
Statlu Creek WaterpowerPower PlantsWithdrawn, May 28, 2014WithdrawalFraser Valley, Electoral Area C, Fraser Valley, Electoral Area F
PAC-RIM PipelineTransmission PipelinesWithdrawn, Jun 11, 2014WithdrawalKitimat
Pembina Condensate PipelineTransmission PipelinesWithdrawn, Jun 11, 2014WithdrawalFraser-Fort George, Electoral Area G
Wolverine Secure LandfillLocal Government Solid Waste Management FacilitiesWithdrawn, Jun 12, 2014WithdrawalPeace River, Electoral Area E, Peace River, Electoral Area D
Jumbo Glacier ResortSki ResortsCertificate Expired, Oct 12, 2014Post Decision – CompleteCentral Kootenay, Electoral Area D
Westcoast Connector Gas TransmissionTransmission PipelinesCertificate Expired, Nov 25, 2014Post Decision – Pre-ConstructionPeace River, Electoral Area B

The decision and its date are the register's own; the phase is where the project stands now. Places are where the EAO's single point for the project lies; a mine, pipeline or line can reach places it isn't listed under.

Source: Environmental Assessment Office project points (EPIC), Province of BC, as of 2026-11-02 (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Every permitted oil and gas pipeline, large or small, is on the BC Energy Regulator's map, which a report reads too: see pipelines near a property. Most gravel pits, quarries and placer and exploration permits are on the Province's map of Mines Act permits: see gravel pits near a property. When a project needs private land, the Expropriation Act sets the notice and the payment: see expropriation.

Buying rural land? Before you buy rural land in BC: the nine questions that decide an offer, on one printable page.