Is a mine, pipeline or other major project planned near my property?

Projects big enough for a provincial environmental assessment are on the Environmental Assessment Office's register, and a report lists those within 10 km of the lot.

Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.

Share

TextEmail

Text and Email open your messages or email app with this message, ready to edit.

What the answer means

A report lists those in assessment or approved within 10 km of the lot line, and flags one in assessment or being built within 1 km.

What the register covers
A project needs a provincial environmental assessment when it passes a size set in the Reviewable Projects Regulation, among them: a new mineral mine producing 75,000 tonnes of ore a year or more, a sand and gravel pit of 500,000 tonnes a year, a power plant of 50 MW, a dam 15 m high, a transmission line of 345 kV and 40 km on new ground, 20 km of new paved highway on new ground, a landfill of 250,000 tonnes a year, and LNG and other energy storage. The minister can also designate a smaller project that isn't substantially started, and anyone can apply for that.
What isn't on it
Smaller works: most gravel pits, quarries, subdivisions, rezonings, cell towers and logging. Logging is in the report's planned cutblocks, local development applications are listed within 200 m where the council publishes them, and Crown land applications within 1 km.
In assessment
The EAO is assessing the project, in phases from early engagement to the application's review, and each phase can take months or years. A project can be withdrawn or refused, and many are. Each assessment has public comment periods, open to anyone, announced on the project's page.
Approved
A certificate has been issued (or the project was approved before the current Act), with conditions the holder must meet. The phase then says whether it's not yet built, under construction, operating or paused. Each certificate sets a deadline, up to 10 years after it's issued, by which the project must be substantially started; the holder can apply to extend it.
One point per project
The register places each project at a single point. A mine's pits, a pipeline, a transmission line or a highway can reach many kilometres past it, so a project listed 8 km away can still run beside the lot, and one placed further away can reach it. The project's page has its maps.

The register gives one point for each project and its own phase and decision, which can lag what's happening on the ground; distances are measured to that point.

Source: Environmental Assessment Office project points (EPIC), Province of BC (Open Government Licence – British Columbia); Reviewable Projects Regulation, B.C. Reg. 243/2019 (thresholds summarised in our words, read 2026-10-06); Environmental Assessment Act, SBC 2018, c. 51, ss. 11 and 31 (summarised in our words, read 2026-10-06); Environmental Assessment Office project information (EPIC) (each project's own page, linked).

Decisions year by year since 1995

35 projects on the register have a decision dated 2016. They're listed below in place of the projects in assessment and approved.

Projects decided each year, 1995 to 2026, by the decision the register holds

Showing projects decided in 2016 Show the projects in assessment and approved

  • Certificate issued or approved
  • No assessment needed
  • Withdrawn, ended, refused or expired

Showing 2016. Point at another year, or open it.

Each bar is one year, counting the projects whose decision the register dates to it. The register holds one decision for each project, its latest, so a certificate that later expired counts as expired, at the date the register gives. The 8 projects approved before the Environmental Assessment Act all carry the date Jun 30, 1995.

Decided in 2016

35 projects on the register have a decision dated 2016: 4 given a certificate or approved, 6 found to need no assessment and 25 withdrawn, ended, refused or expired. Each is listed with the places it's in or within 5 km of, and its phase now. Every project in assessment or approved.

Certificate issued or approved (4)

ProjectDecisionPhasePlaces
Eagle Mountain - Woodfibre Gas PipelineTransmission PipelinesCertificate Issued, Aug 9, 2016Post Decision – Pre-ConstructionMetro Vancouver, Electoral Area A
Northeast British Columbia (NEBC) ExpansionTransmission PipelinesCertificate Issued, Aug 9, 2016Post Decision – OperationPeace River, Electoral Area B
Baldy Ridge ExtensionCoal MinesCertificate Issued, Sep 19, 2016Post Decision – AmendmentSparwood, East Kootenay, Electoral Area A
Giscome Quarry and Lime PlantConstruction Stone and Industrial Mineral QuarriesCertificate Issued, Dec 14, 2016Post Decision – ExtensionFraser-Fort George, Electoral Area F

No assessment needed (6)

ProjectDecisionPhasePlaces
Campbell River Water SupplyWater DiversionCertificate Not Required, Feb 18, 2016Post Decision – OperationCampbell River, Strathcona, Electoral Area A, Strathcona, Electoral Area D (Oyster Bay - Buttle Lake)
Meadows QuarrySand and Gravel PitsNot Designated Reviewable, May 2, 2016Post Decision – CompleteMission, Abbotsford, Maple Ridge, Langley (district municipality)
Point Grey Tidal MarshShoreline ModificationCertificate Not Required, Sep 19, 2016OtherRichmond, Metro Vancouver, Electoral Area A, Vancouver
South Arm Jetty Tidal MarshShoreline ModificationCertificate Not Required, Sep 19, 2016OtherRichmond, Delta
Tsawwassen EelgrassShoreline ModificationCertificate Not Required, Sep 19, 2016Pre-ApplicationDelta
McMillan Island ErosionShoreline ModificationCertificate Not Required, Oct 28, 2016Post Decision – ConstructionLangley (district municipality), Maple Ridge

Withdrawn, ended, refused or expired (25)

ProjectDecisionPhasePlaces
Sustut CopperMineral MinesWithdrawn, Mar 7, 2016WithdrawalStikine Region
Schaft Creek MineMineral MinesWithdrawn, Mar 22, 2016WithdrawalKitimat-Stikine, Electoral Area D
Kutcho Copper-Zinc-Silver-Gold MineMineral MinesWithdrawn, Mar 29, 2016WithdrawalStikine Region
Highland Valley Copper RefineryOrganic and Inorganic Chemical IndustryWithdrawn, Mar 31, 2016WithdrawalLogan Lake
Raven Underground CoalCoal MinesTerminated, Apr 4, 2016TerminationComox Valley, Electoral Area A
Rocky Creek EnergyPower PlantsWithdrawn, Apr 8, 2016WithdrawalPeace River, Electoral Area E
McGregor/Herrick HydroelectricPower PlantsWithdrawn, Apr 18, 2016WithdrawalFraser-Fort George, Electoral Area F
Bute Inlet HydroelectricPower PlantsWithdrawn, Apr 26, 2016WithdrawalStrathcona, Electoral Area C
Vancouver Island CableElectric Transmission LinesWithdrawn, May 2, 2016WithdrawalFraser Valley, Electoral Area C
Mount Kathleen Wind ParkPower PlantsWithdrawn, May 10, 2016WithdrawalOkanagan-Similkameen, Electoral Area H, Central Okanagan West, Okanagan-Similkameen, Electoral Area F
Mount George Wind ParkPower PlantsWithdrawn, May 11, 2016WithdrawalFraser-Fort George, Electoral Area F, Fraser-Fort George, Electoral Area E
Banks Island North Wind EnergyPower PlantsWithdrawn, May 13, 2016WithdrawalNorth Coast, Electoral Area C
Tsilhqot'in Power DevelopmentPower PlantsWithdrawn, May 13, 2016WithdrawalCariboo, Electoral Area K
Upper Pitt River Water PowerPower PlantsWithdrawn, May 16, 2016WithdrawalFraser Valley, Electoral Area F
Marten Ridge Wind EnergyPower PlantsWithdrawn, May 18, 2016WithdrawalEast Kootenay, Electoral Area A
Nicomen Wind EnergyPower PlantsWithdrawn, May 18, 2016WithdrawalThompson-Nicola, Electoral Area I (Blue Sky Country)
Horizon Mine CoalCoal MinesTerminated, Jun 3, 2016TerminationTumbler Ridge, Peace River, Electoral Area D
South Meager GeothermalPower PlantsTerminated, Jun 10, 2016TerminationSquamish-Lillooet, Electoral Area C
Bear River GravelSand and Gravel PitsWithdrawn, Jul 5, 2016WithdrawalKitimat-Stikine, Electoral Area A
Lodgepole Coal MineCoal MinesWithdrawn, Jul 5, 2016WithdrawalEast Kootenay, Electoral Area B, East Kootenay, Electoral Area A
Hills Bar Aggregate QuarryingSand and Gravel PitsWithdrawn, Jul 26, 2016WithdrawalFraser Valley, Electoral Area B
Cascade Heritage PowerPower PlantsCertificate Expired, Aug 3, 2016CompleteKootenay Boundary C / Christina Lake
Wartenbe Wind EnergyPower PlantsCertificate Expired, Oct 5, 2016Post Decision – CompletePeace River, Electoral Area E
Steveston Island Tidal MarshShoreline ModificationWithdrawn, Dec 9, 2016WithdrawalDelta, Richmond
Nahwitti Wind FarmPower PlantsCertificate Expired, Dec 21, 2016Post Decision – CompleteMount Waddington, Electoral Area B

The decision and its date are the register's own; the phase is where the project stands now. Places are where the EAO's single point for the project lies; a mine, pipeline or line can reach places it isn't listed under.

Source: Environmental Assessment Office project points (EPIC), Province of BC, as of 2026-11-02 (Open Government Licence – British Columbia); 2021 census subdivision boundaries, Statistics Canada (Statistics Canada Open Licence).

Every permitted oil and gas pipeline, large or small, is on the BC Energy Regulator's map, which a report reads too: see pipelines near a property. Most gravel pits, quarries and placer and exploration permits are on the Province's map of Mines Act permits: see gravel pits near a property. When a project needs private land, the Expropriation Act sets the notice and the payment: see expropriation.

Buying rural land? Before you buy rural land in BC: the nine questions that decide an offer, on one printable page.