PlaceDossier / Zoning / Township of Langley

C-3: Service Commercial

C-3 is a zone in Township of Langley Zoning Bylaw 1987 No. 2500 (Township of Langley). Our summary of Section 603 of the bylaw as amended to July 27, 2026.

What the zone allows

Homes allowed
No house: one home or mobile home per lot for the owner, manager or caretaker and their family, accessory to the commercial use (ss. 603.1, 603.3)
Main uses
Highway commercial uses (sales, rental or servicing of vehicles, trailers, RVs, mobile homes, boats and farm or industrial machinery; lumber and building supply yards, nurseries and garden centres, hotels; s. 102), home improvement centres, furniture and appliance stores, auto parts and computer stores, feed, fertilizer and pet supply sales, convenience stores of up to 450 m², bakeries, dry cleaners, personal services, restaurants, funeral homes (no crematoria), assembly uses, commercial recreation (no arcades, pool halls or casinos), gas bars and service stations, vehicle servicing and repair shops, appliance repair, taxi and delivery offices, transit depots, veterinary clinics, video stores, wholesale distribution, seasonal farm produce sales, a container return centre of up to 280 m²; a caretaker's home and accessory uses (s. 603.1)
Exceptions (1)
  • A liquor store on two lots the bylaw names

Listed in s. 603.1 14), 29) of the bylaw.

Smallest lot for a subdivision
1,858 m² (s. 110.1)
Lot coverage
40% (s. 603.4)
Height limit
12 m (s. 603.6)
Setbacks
Front 4.5 m, rear 3.0 m, sides 0 m, flanking street side 4.5 m; 9.0 m from a line next to a suburban, residential, manufactured home or multiple family zone (s. 603.5). On a corner lot nothing over 1 m high, buildings, structures and fences included, in the triangle between points 7.5 m along each lot line from the corner (s. 104.4 4)). The bylaw sets no fence height in this zone (s. 111.6 leaves it out); barbed wire only above 2 m on a fence or wall (s. 111.7); a fence or retaining wall may stand anywhere on the lot outside the corner sight triangle (s. 104.4 5)). An off-street parking area keeps 1.5 m from a lot line it shares or one on a street, and off the required landscaping (s. 107.5 3)). Landscaping (s. 111.3): a 2.0 m landscaped strip along the front and flanking street lines; along the rear and inside side lines, to within 3.0 m of the front line, a 2.0 m strip with a 1.5 m screen, and the same round permitted outside storage; not beside buildings the zone's own setbacks place there (note (13)). Fuel pumps, pump islands, air hoses and other service station equipment 5 m from every lot line, and their canopies 3 m (s. 104.4 7)). The front lot line is the one on a street; where a lot touches two or more streets, the shorter street line (corner cuts aside); where its frontage is on a lane, the line opposite the lane; on a panhandle lot, the main body's line nearest the street it's reached from. The rear lot line is the one opposite and farthest from the front, and every other line is a side lot line (s. 102). Into a setback (s. 104.4 1), 2), 10), 11)): chimneys, gutters, sills, steps, eaves, sunshades, canopies, cantilevered balconies, open porches and ornamental features up to 0.6 m; bay windows, china cabinets, bathroom kickouts and entertainment units up to 0.6 m, adding at most 3 m² of floor in the front setback, 2 m² in a side one and 4 m² in the rear; a basement stairwell and landing of at most 1.5 m² up to 1.2 m into the rear setback, or into a side setback where both the front and rear lot lines face a street. A building sited before a bylaw change may be repaired or added to only without breaking the setbacks further (s. 104.4 3)). Inside side setbacks don't apply to zero lot line development or to strata lots in a building where a wall is shared by more than two homes (s. 104.4 6)). An accessory building stands at least 1.5 m from the main building (s. 102, accessory building; a closer one counts as part of the main building, our reading), and one joined to it by a foundation, walls and a roof forming living space is part of it (s. 104.15 2)). Residential swimming pools keep accessory buildings' setbacks (s. 104.11); a satellite dish on the main building is sited as the main building, one standing alone as an accessory building (s. 104.4 9)). Every building and structure stays 2 m from a high pressure gas or oil pipeline right of way (s. 104.4 8)) and, whatever else the bylaw says, 30 m from the natural boundary of the Fraser, Nicomekl, Salmon or Campbell River, 20 m from Murray Creek, 15 m from any other watercourse and from the top of Anderson Creek's bank north of 36 Avenue, and 7.5 m from a lake, swamp or pond; fill placed to raise a floor keeps the same distances (s. 105.1 2), 5)).

Business is carried on inside a building, except parking, loading, display, commercial recreation, eating areas and seasonal uses (s. 603.2).

Parking and loading by use (s. 107); landscaping, screens and fencing (s. 111).

Short-term rental isn't a listed use in this zone; ask the Township before renting a home by the night.

Allowed in every zone (s. 104.10): private gardens that go with a home; public parks, playgrounds, public recreation facilities and open space or conservation areas; public schools; public utility structures and facilities (telecommunication towers also follow the Township's Telecommunication Tower Master Plan Policy); selling vehicles from a property, up to 5 in 12 months with no more than 2 for sale at a time; and a residential sales centre, on conditions: a covenant and security to remove it within 30 days of the final inspections of the homes it sells, office parking, the zone's coverage, siting and height, and only on a lot under a development application for a multiple family or comprehensive development zone that includes multiple family use, or one designated for residential use in the same neighbourhood plan area (or the same community plan area where there's no neighbourhood plan).

Also in Section 100: a zone boundary that follows a road, lane, waterway or right-of-way runs along its centre (s. 104.2 2)); where a land use contract is registered on land, the land may be used as the contract allows despite this bylaw, and the bylaw's rules fill any gap the contract leaves (s. 104.13); land in the ALR is also under the Agricultural Land Commission Act (s. 104.9); in a Development Permit Area of the Official Community Plan, subject to the Local Government Act, land isn't subdivided and no building or addition starts until a development permit is issued (s. 106.1); temporary use permits may be issued on any land outside the ALR (s. 112.1); and a breach is an offence with a penalty of up to $10,000, each day a separate offence (ss. 103.2, 103.3).

Lot coverage is the ground covered by all buildings and structures and their projections, and paving isn't a structure (s. 102). Height is measured from the average finished grade round the building to its highest point, or on a gable, hip or gambrel roof to the average level between eaves and ridge (s. 102). Church spires, chimneys, flagpoles, masts, silos, aerials, water tanks, belfries, monuments, transmission towers, elevators, ventilation machinery, public utility structures, public recreation facilities and public schools are exempt from the height limits (s. 104.5 1), 4)), but the Langley Airport Zoning Regulations apply regardless (s. 104.6). In the Fort Langley area drawn on the map in s. 104.5 3), which we don't read, buildings are at most 9 m and 2 storeys, with no room above the second storey, and a basement isn't a storey if its first floor is under 800 mm above the average grade round the building (s. 104.5 2)): ask the Township whether a lot is in it. A building that doesn't meet a zoning rule adopted after it was built may be repaired, extended or altered only so far as that adds no breach beyond the one it already had (s. 104.4 3)). A lot on a plan deposited at the Land Title Office before this bylaw was passed, smaller than the zone's minimum, may still be used for the zone's uses if it meets the zone's other requirements (s. 104.12).

An accessory building goes up only once the main building is built or is being built with it (s. 104.15 1)). If a subdivision leaves an accessory building on a lot with no main building, it may stay on conditions: it was customarily incidental to the main building before and stood at least 1.5 m from it, it meets the new lot's siting, it is secured and not used (a swimming pool emptied, covered and secured), and a covenant with security requires its removal unless a main building is built within 12 months; an accessory dwelling unit that meets the zone's rules for a main home on the new lot is exempt from those conditions (s. 104.15 3)).

Subdivision: lots made by consolidation or a lot line adjustment may be considered for approval below the s. 110.1 minimums (s. 110.5); there are no minimums where land is acquired only for a park, road, conservation area or school site and the subdivision doesn't add lots beyond the subject parcel (s. 110.4), or for unattended utility equipment (s. 110.3); a lot split by a Provincial Highway counts as conforming for subdivision (s. 110.9).

Flood elevation (s. 105.1 3) to 5)): in any new, rebuilt, moved or extended building, the underside of a wooden floor or the top of a concrete slab of any area used for living, business or storing goods floodwater can damage is at or above the flood construction level (the Province's 200-year Fraser River flood level for that stretch plus 0.6 m) and at least 4 m above the natural boundary of Murray Creek, the Nicomekl River and its tributaries on the Nicomekl floodplain (land under 14 m geodetic), 3 m above the Salmon River or Bertrand Creek, 2.5 m above the Campbell River and the tributaries of Bertrand Creek, and 1.5 m above any other watercourse or a lake, swamp or pond. This doesn't apply to renovating a home without adding to it, an addition to a home of less than 25% of the floor area it had when the bylaw was adopted, a carport or garage, or a farm building other than a home or closed-sided livestock housing, which must stand 1 m above natural ground (s. 105.1 4)). As written the rule isn't limited to floodplain land. Before a building permit: agreement to join a community sewer where required (or a qualified professional's certificate for a sewage system where the Township allows one) and a BC Land Surveyor's certificate that the site's final elevation meets the flood construction level. The level may be reached by raising the building, compacted fill or both, and no furnace or fixed equipment goes below it (s. 105.1 5)).

Home occupations (s. 104.3) are allowed in every zone that permits a residential use (that a caretaker's home counts is our reading). The bylaw sets their size and staffing limits for rural, urban and suburban lots and for a list of zones that doesn't include this one, so which limit applies here is unclear: ask the Township.

Signs follow the Township's Sign Bylaw 2012 No. 4927 (s. 104.8).

Landscaping (s. 111.2): except where s. 111.3 sets a strip or screen, every part of a lot with a building that isn't built on or used for parking, loading, permitted open storage or walking is lawn or otherwise suitably landscaped, and kept that way. Parking lot landscaping (s. 111.4 1), 2)): one tree for every 6 stalls in at least 10 m³ of growing medium (or the equivalent of 40 m³ of structural soil); between two facing rows, one tree for every 12 stalls, at most 18 m apart; each row's end has a tree and a landscaping area at least 2 m wide between the last stall and the aisle, and a single row has a 2 m landscaping area between it and the aisle unless there's a walkway.

Accessible parking, for buildings that must be accessible to people with disabilities (s. 107.11): 1 accessible space per 1 to 25 required spaces, 2 per 26 to 50, then 1 more for each additional 50 or part (hospitals, medical uses and seniors' housing: 1 per 1 to 15, 2 per 16 to 30, 3 per 31 to 60, 4 per 61 to 90, 5 per 91 to 150, then 1 more per 50 or part); van accessible spaces within those, a minimum of 1 and 1 for every 4 accessible spaces or part (every 3 for hospitals, medical uses and seniors' housing). An accessible space is 5.8 by 2.6 m and a van space 5.8 by 3.4 m, each on a firm level surface as close as practical to an accessible entrance, marked on the pavement and by a sign, with a 2.0 m access aisle hatched in paint.

Loading spaces (s. 107.7, 107.8 2), 3)): Class A is 7.0 m long and 2.7 m wide with 3.0 m clear height; Class B 9.3 by 3.5 m and Class C 23.0 by 3.5 m, both with 4.3 m clear; room to manoeuvre; graded so they don't interfere with parking, aisles or walkways or back onto a road; marked with signs and pavement markings; one beside each overhead loading door, or beside the shipping and receiving or main entry doors if there are none. They don't count as parking spaces, and garbage, recycling and staging stay on the site and off the road.

Bicycle spaces are kept off walkways, 2.0 m or a barrier from parking and loading spaces, and lit; visitor spaces are at ground level within 30 m of the main entrance; secure spaces are in a bicycle room, an expanded metal mesh compound or numbered lockers, within a building or private parking area, at, one level above or below ground with easy access outside, within 30 m of an entrance (s. 107.12). Where secure bicycle parking is required for a use that isn't a home, add clothing lockers equal in number to the secure spaces, and showers, basins and toilets by the count (10 to 29 secure spaces: 1 of each; 30 to 49: 2 toilets, 1 basin, 2 showers; 50 or more: 3, 2, 3), unless an employee fitness centre in the building has facilities that meet those counts, open to all employees before and after shifts and near the bicycle area (s. 107.12 3)). Cash in lieu of up to 25% of the non-visitor bicycle spaces may be accepted at the Township's discretion (s. 107.12 4)).

Parking design (ss. 107.1 1), 107.2, 107.4, 107.5): spaces go on the same lot as the building or use; a fraction of 0.5 or more rounds up to a space; a building with several uses adds each use's spaces; gross floor area for parking counts accessory buildings and basements except what's used for parking, mechanical purposes or storage. A 90 degree stall is 5.8 m long and 2.9 m wide with a 6.0 m aisle for two-way traffic, 2.75 m with 6.7 m, or 2.6 m with 7.3 m (other angles, parallel and tandem stalls are in the s. 107.5 table), and 0.3 m wider for each fence or structure over 0.3 m high along its side; up to 20% of the required stalls may be small-car stalls, 90 degree, at least 2.44 by 4.88 m and signed for small cars only; each required stall and aisle is surfaced with asphalt or concrete.

Amusement machines are a commercial use only as an accessory to a permitted use; where up to four are allowed that way, they take at most 10% of the main use's gross floor area, counting at least 4 m² of floor for each machine (ss. 102, 104.17). An arcade (more than four machines open to the public) isn't a listed use here (ss. 101.4, 102).

Required parking (s. 107.3): shops, service uses and personal services 1 space per 35 m² of gross floor area; offices and restaurants 1 per 35 m²; vehicle servicing 1 per 46 m² plus 1 per service bay plus 1 per 2 employees; commercial assembly (funeral homes) 1 per 12 m²; hotels 1 per accommodation space plus 1 per employee; assembly uses 1 per 10 seats plus 1 per 19 m² of assembly floor area; recreation 1 per 45 m² plus 1 per 10 spectator seats. A home that is part of a commercial building needs 1.5 spaces; for a caretaker's home standing apart the table doesn't say: ask the Township. A use the table doesn't name, such as selling vehicles or machinery, a lumber yard, a nursery, a veterinary clinic or wholesale distribution, isn't covered: ask the Township.

Loading spaces required (s. 107.8): a commercial building of 500 to 1,999 m² needs one Class B space, and one more for each additional 2,500 m² or part over 1,999 m².

Bicycle parking (s. 107.12 2)): 6 visitor bicycle spaces at each public entrance of a commercial building and, where its gross floor area is 2,000 m² or more, secure bicycle spaces at 0.06 per 100 m².

Uses the zone doesn't list aren't allowed, even where a general clause might seem to cover them (s. 101.4); the uses s. 104.10 allows in every zone are the exception.

Site-specific exceptions listed in the bylaw by legal description can add or change uses for one property, and development permit areas, the ALR and building rules apply on top. Confirm with the Township of Langley's community development division before you buy or build.

Source: Section 603 of Township of Langley Zoning Bylaw 1987 No. 2500 (summarised in our words, checked 2026-10-30); Section 100 (definitions and general rules), Township of Langley Zoning Bylaw No. 2500; zone map: Open Government Licence – Township of Langley.

Township of Langley Zoning Bylaw 1987 No. 2500 applies in Langley (district municipality).

C-3 in other BC bylaws: what C-3 allows in each of the 19 we've summarised.

Other rural zones RU-1 to RU-3, the rural floodplain zones RU-4 and RU-5 and the Rural Golf Course zone RU-10, suburban, single family, two family (R-2) and compact lot zones, the Comprehensive Rural Estate zone CRE-1, the comprehensive development zones CD-4, CD-12, CD-20, CD-21, CD-38, CD-54, CD-55, CD-56, CD-58 (townhouses) and CD-130 (rowhouses), the Community Commercial zone C-2, the Service Commercial zone C-3, the Service Industrial zone M-1A, the General Industrial zones M-2 and M-2A, the Heavy Industrial zone M-3 and the Civic Institutional zone P-1 zones in this bylaw

RU-1 Rural, RU-2 Rural, RU-3 Rural, SR-1 Suburban Residential, SR-2 Suburban Residential, SR-3 Suburban Residential, R-1A Residential, R-1B Residential, R-1C Residential, R-1D Residential, R-1E Residential, R-CL Residential Compact Lot, R-CL(A) Residential Compact Lot, R-CL(B) Residential Compact Lot, R-CL(RH) Residential Compact Lot (rowhouse), R-CL(SD) Residential Compact Lot (semi-detached), P-1 Civic Institutional, RU-5 Rural Floodplain, C-2 Community Commercial, M-2 General Industrial, CRE-1 Comprehensive Rural Estate, CD-21 Comprehensive Development CD-21, CD-55 Comprehensive Development CD-55, CD-12 Comprehensive Development CD-12, CD-54 Comprehensive Development CD-54, M-2A General Industrial, M-3 Heavy Industrial, RU-4 Rural Floodplain, CD-20 Comprehensive Development CD-20, CD-4 Comprehensive Development CD-4, CD-38 Comprehensive Development CD-38, CD-56 Comprehensive Development CD-56, RU-10 Rural Golf Course, R-2 Residential, R-CL(CH) Residential Compact Lot (coach house), M-1A Service Industrial, CD-58 Comprehensive Development CD-58, CD-130 Comprehensive Development CD-130.