Do I need a permit to add a basement walkout or outside basement door in BC?

It depends on the council: Kamloops and Penticton both need a permit to build a basement walkout or door well, and to cut a new door opening in a wall.

Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.

Share

TextEmail

Text and Email open your messages or email app with this message, ready to edit.

What the answer means

No provincial rule says whether a basement walkout needs a building permit: each council's or regional district's building bylaw does. Of the councils we read, Kamloops and Penticton both list building a basement walkout (a door well) among the work that needs a permit, and both need one to create a new opening for a door or window, or make one bigger.

Who decides
Whether work needs a building permit is set by the local building bylaw, so the answer is the council's, or the regional district's where it runs building inspection (our reading; see building permits for which electoral areas have it). Where no one inspects, there is no permit to get, but the work is still the owner's to answer for (our reading).
Kamloops
The City of Kamloops lists among the exterior renovations that will require a permit: construct a basement walkout (door well), and remove or create new openings for, or increase the size of, doors and windows. It adds that work it lists as exempt may still need a permit where it could structurally compromise a structure or adjacent property, or lies in an environmentally or geotechnically sensitive area (its Bulletin No. 23-01, When Building Permits Are Required, revised April 2025).
Penticton
The City of Penticton lists the same: construct a basement walkout (door well), and create new openings for, or increase the size of, doors and windows (its Bulletin No. 13-01, When Are Permits Required?, revised February 28, 2019).
The new opening
A door cut into a basement wall takes away part of a foundation wall that carries the house, so the opening most often needs a header or beam sized for it, and an engineer's design is commonly asked for (our reading; see removing a wall and foundation repair).
Water at the door
A door well sits below the ground around it, so where its water drains to matters: the house's foundation drain and its outlet are the Building Code's (as the perimeter drains page reads Section 9.14), and the ground around the house should slope water away (our reading).
Digging
Digging the door well means a locate request through BC 1 Call before the excavator starts, as for any work that breaks ground (see call before you dig). Digging next to a foundation, or near a neighbour's building, is the kind of work Kamloops' bulletin says can need a permit even where the rest wouldn't (its Bulletin No. 23-01).
The zone
Stairs and retaining walls of a door well sit in the yard, where the zone's setbacks can reach them (our reading; see setbacks and retaining walls).
A suite's own door
A walkout is often how a basement suite gets its own entrance; the suite itself needs the zone's leave and its own permit (see legalizing a suite).
Older houses
Kamloops asks for a hazardous materials assessment before it issues a building permit for any renovation or addition to a home older than 1992 (its Bulletin No. 23-01); the OHS Regulation's survey before hired work is on the asbestos page.
What it means for a buyer
A basement door that wasn't on the original plans is worth checking against the council's permit file, and a door well with stains, a damp floor or no drain at its foot is worth a home inspector's look (our reading; see home inspections and unpermitted work).

Our summary of the City of Kamloops' Bulletin No. 23-01 (revised April 2025) and the City of Penticton's Bulletin No. 13-01 (revised February 28, 2019), read 2026-10-28, and of the drainage, digging, zone, suite and survey rules as their own pages read them. Other councils' building bylaws differ and we haven't read them: ask the council.

Source: Bulletin No. 23-01, When Building Permits Are Required, City of Kamloops (revised April 2025; summarised in our words, read 2026-10-28); Building Bulletin No. 13-01, When Are Permits Required?, City of Penticton (revised February 28, 2019; summarised in our words, read 2026-10-28).

Before you buy: who to ask

The seller or their agent
Was the basement door there when the house was built? If not, when was it added, by whom and under which permit? Has the door well ever flooded?
The local government
Is there a building permit on file for the walkout, and was it closed with a final inspection?
Your home inspector or a specialist
Is there a drain at the foot of the door well, and any sign of water in the basement by the door? Is there cracking around the opening?

Look up the lot above: its buildable section gives the slope of the ground around the house.

See also finishing a basement, legalizing a suite, removing a wall, foundation repair, perimeter drains, call before you dig and unpermitted work.