Does removing or opening a wall need a building permit in BC, and does it need an engineer?
It depends on the council: Kamloops needs a permit to remove an interior wall, load-bearing or not, and Maple Ridge's basement permit asks an engineer's letter when walls come out.
Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.
What the answer means
No provincial rule says whether taking out a wall needs a permit: each council's or regional district's building bylaw does. Of the councils we read, Kamloops needs a permit to remove, move or open any interior wall, load-bearing or not, and Coquitlam needs one for alterations to existing construction. A load-bearing wall holds up the floor or roof above it, and Maple Ridge's basement finish permit asks for a structural engineer's letter of assurance when walls come out or openings in load-bearing walls get bigger.
- Who decides
- Whether work needs a building permit is set by the local building bylaw, so the answer is the council's, or the regional district's where it runs building inspection (our reading; see building permits for which electoral areas have it). Where no one inspects, there is no permit to get, but the work is still the owner's to answer for (our reading).
- Kamloops
- The City of Kamloops lists among the interior renovations that will require a permit: installing, changing, removing or repairing load-bearing walls and other structural components; removing, moving or opening interior non-load-bearing walls and drop ceilings; and removing drywall on fire separations or exterior walls. Even putting in kitchen or bathroom cupboards needs one if walls or drywall come out (its Bulletin No. 23-01, When Building Permits Are Required, revised April 2025).
- Coquitlam
- The City of Coquitlam says building and plumbing permits are required for alterations to existing construction, and lists creating new rooms or spaces in an existing building and the restoration, maintenance or repair of a building's structural components among the work that needs one. Repairs that don't affect the structural or fire and life safety performance of a building need none (its Building Division FAQ).
- Maple Ridge and the engineer
- The City of Maple Ridge asks for each professional engineer's Schedule B and proof of liability insurance if you plan on removing walls or increasing the size of openings in load-bearing interior or exterior walls (its Basement Finish Permit Application Guide). A Schedule B is the engineer's letter of assurance that they designed the work and will review it on site (our reading).
- Load-bearing or not
- A load-bearing wall carries the floor, roof or another wall above it; taking it out or widening an opening in it means a beam or header and posts that carry the load down to the foundation instead (our reading). Whether a wall bears load can't always be told from the room side, so councils ask for drawings, and some for an engineer, before it comes out (our reading).
- Fire separations
- A wall between the house and an attached garage, or between a house and its suite, can be a fire separation the BC Building Code asks for; Kamloops needs a permit to remove drywall on one (its Bulletin No. 23-01). Taking such a wall out, or opening it, can leave the suite or the garage without the separation it needs (our reading; see legalizing a suite).
- Wiring, gas and plumbing in the wall
- Moving outlets, switches or wiring out of a wall is electrical work under a Technical Safety BC permit, or the council's own in the places that issue their own (see electrical and gas permits). Kamloops leaves electrical and gas work to Technical Safety BC, and needs its plumbing permit to add, remove or move drainage, venting or water lines (its Bulletin No. 23-01; see plumbing permits).
- Asbestos and lead in old walls
- Drywall joint compound, plaster and paint in a house built before 1990 may hold asbestos or lead (see asbestos and lead paint). Before work begins on renovating a building, every employer responsible for the work, and the owner, must have a qualified person inspect it for hazardous materials (Occupational Health and Safety Regulation s. 20.112), so hired work opening a wall in an older house is work the survey reaches (our reading).
- In a strata
- In a strata, altering a lot in a way that involves the structure of a building needs the strata corporation's written approval under the Standard Bylaws, and a wall that is the common boundary between two lots comes out only with its prior written approval, given with copies of any building permit (Standard Bylaws s. 5 (1); Strata Property Act s. 70, as the strata renovations page reads them).
- Work done without a permit
- Kamloops lists what starting work without a permit can lead to: a stop work order, remedial repairs and removal of materials, fines, doubled permit fees, and a notice on title that work was done without permits (its Bulletin No. 23-01). The note on title stays with the lot when it sells (see unpermitted work).
- What it means for a buyer
- An open plan in an older house often means a wall came out. Ask when, by whom, whether a beam went in and whether a permit was taken; a sagging floor or ceiling, or cracks above the opening, are worth a home inspector's look (our reading; see home inspections). The council's file shows whether a permit and its inspections were closed (see property records).
Our summary of the City of Kamloops' Bulletin No. 23-01 (revised April 2025), the City of Coquitlam's Building Division FAQ, the City of Maple Ridge's Basement Finish Permit Application Guide, the hazardous materials survey and lead paint rules as their own pages read them, and the Standard Bylaws and Strata Property Act s. 70 as the strata renovations page reads them, read 2026-10-28. Other councils' building bylaws differ and we haven't read them: ask the council.
Sources (read 2026-10-28; summarised in our own words unless noted): Bulletin No. 23-01, When Building Permits Are Required, City of Kamloops (revised April 2025; summarised in our words); Building Division FAQ, City of Coquitlam; Basement Finish Permit Application Guide, City of Maple Ridge.
Before you buy: who to ask
- The seller or their agent
- Which walls were taken out or opened, when and by whom? Did a beam go in, did an engineer design it, and was a permit taken and closed?
- The local government
- Is there a building permit on file for past work on the walls? Does your bylaw need a permit, and an engineer, for the wall I plan to take out?
Look up the lot above: its earthquake section gives the shaking the house's walls have to stand up to.
See also building permits, adding a room, finishing a basement, asbestos, renovating a strata unit, kitchen and bathroom renovations and unpermitted work.