PlaceDossier / Zoning / Regional District of North Okanagan
CD.2: Mabel Lake Comprehensive Development
CD.2 is a zone in Regional District of North Okanagan Zoning Bylaw No. 3000, 2023 (Regional District of North Okanagan). Our summary of Section 18.2 of the bylaw as amended to July 22, 2026.
What the zone allows
- Homes allowed
- Up to 106 lease strata lots, each with one single family house, one RV or one park model; and one home for the golf course's owner, operator or an employee
- Main uses
- A nine-hole golf course with clubhouse (shops, restaurant, licensed lounge, offices), driving range, trails and airstrip buildings; a temporary sales and information office; lease strata lots for houses, RVs and park models
- Smallest lot for a subdivision
- Lease strata lots of at least 560 m²; the zone sets no minimum for other new lots (frontage 10% of the lot's perimeter)
- Lot coverage
- 30%
- Height limit
- Two storeys plus a basement (no height in metres is set)
- Setbacks
- None required (s. 18.2(9)). Projections (s. 4.4(1)): chimneys, cornices, built-in hutches, gutters, pilasters, belt courses, bay windows and ornamental features up to 0.6 m into a setback; steps, decks, eaves, sunlight control projections, canopies, balconies, covered decks and open porches up to 1 m. A building or structure under 10 m², no more than 2.5 m tall and not shedding water onto a neighbouring lot needn't meet the interior side and rear setbacks (s. 4.4(2)); an underground structure whose top is no higher than the average finished ground may sit anywhere on the lot (s. 4.4(3)). Where a lot touches more than one road, the front line is the shortest street line (with equal lines, the one most neighbouring buildings face) and the other street lines are exterior sides, the line opposite the front staying the rear (s. 2; the rear on a lot with roads front and back is our reading). On a corner (lines meeting at 135° or less), no fence, hedge or other screen over 1 m tall, or lower where it is a traffic hazard, in the triangle reaching 6 m along each street line from the corner (ss. 9.1(1)(d), 9.2(4)); no sign within 6 m of a lot corner at the meeting of two public roads or of a lot corner on a public road shared with the next lot, and freestanding signs 1 m from every lot line unless the bylaw says otherwise (s. 11.1(9)). Floodplain setbacks (s. 6.1(4)): 30 m from the natural boundary of the Shuswap and Kettle rivers and Ashton, Bessette, Cherry, Duteau, Ferry, Kingfisher, Monashee, Tsuius and Wap creeks, and 15 m from the natural boundary of any other watercourse, lake, marsh or pond, from a standard dyke right-of-way or other flood protection or seepage control structure, and from the 601.72 m contour beside Sugar Lake; the greater applies where two do. Fill needed to carry a floor or pad stays outside every such setback (s. 6.1(6)). The setback is defined as the distance to fill or structural supports that raise a floor or pad (s. 2), while s. 6.1 is headed as for buildings and structures, so whether it also holds back a building that needs no raising is unclear: ask the RDNO. The Board may grant an exemption (s. 6.1(10)). Riparian assessment area (s. 6.2): no development within it (set by the provincial Riparian Areas Protection Regulation) unless a qualified environmental professional's assessment sets a smaller setback or the province approves; a subdivision that proposes no change inside the area, shows a building site and sewage area outside it and registers a covenant against development there is excepted
Everything is on community water and community sewer (s. 18.2(6)). Strata roads are at least 15 m wide with 7.7 m paved; 75 parking spaces and a landscaped area are placed on the zoning map (s. 18.2(10)-(12)).
Written for one site; public parks aren't automatically allowed in comprehensive development zones (s. 3.2(3)).
Heights are measured from finished grade (the lowest of the average ground levels beside each exterior wall) to the highest point (s. 2); radio and television antennas, spires, belfries and domes of places of worship, and fire and hose towers aren't limited in height, and elevator shafts, stair towers, chimneys and smoke stacks and rooftop mechanical works may rise up to 2.5 m above the limit (s. 4.3).
An accessory building or structure has at most two plumbing fixtures, a toilet and a sink or two sinks (s. 2); farm buildings are covered by ss. 3.5(5) and 3.6(2).
Existing lots (s. 3.1): a lot that existed when the bylaw took effect (adopted 7 February 2024) and is smaller or narrower than the zone asks may still be used for the zone's permitted uses if it meets the zone's other requirements and breaks no other rule of the bylaw. A new lot's frontage is the zone's figure: the bylaw exempts new lots from the statutory 10%-of-perimeter rule where that is met, sets no minimum frontage for park lots, and the owner may ask the Board for an exemption (s. 5.7).
Signs (s. 11) are written for Electoral Areas B, C, D and F only; the bylaw says nothing for Area E, so ask the RDNO there. A sign permit from the Building Inspector is needed, except for flagpoles and for the general signs any property may have: community events, construction, business directional, government, neighbourhood watch, political, real estate, celebration and community identification signs (real estate and political signs at most 1 m² in a residential zone and 3 m² elsewhere; freestanding ones at most 3 m high) (s. 11.1(1), (3), (10)). A sign generally has to relate to something on the same property (s. 11.1(2)), though the general signs include business directional ones and one off-premise sign is allowed on a rural lot of 1 ha or more in Area D with no home occupation sign (s. 11.1(3), (5)). Animated, flashing and portable or temporary signs, billboards and roof signs are prohibited (s. 11.1(4)); one freestanding sign per property besides the general signs, with copy at most 45% of the sign area (s. 11.1(7), (8)).
Public parks and playgrounds are allowed in every zone except the comprehensive development zones (s. 3.2(3)); a use the bylaw doesn't list is not allowed (s. 3.2(1)). Prohibited in all zones unless the bylaw specifically permits it elsewhere (s. 3.3): a cellar used as a dwelling (storing goods and mechanical or utility equipment is allowed); any use carried on wholly or partly in a tent, RV, park model, modular storage container or manufactured home, except that one tent or one RV up to 10 m long (hitch excluded) may be used outside a campground for up to 30 days a calendar year; a temporary building used as a dwelling, except under s. 3.22; unenclosed storage of cars and trucks (or their parts) that are in an advanced state of disrepair, wrecked or being dismantled for salvage, except as ss. 3.28 and 14.2 allow; manufacturing petroleum (except as s. 14.2 allows); incinerating or processing fish, animal or vegetable waste (except as s. 14.3 allows); manufacturing pulp and paper; sewage treatment plants that discharge to surface water; cannabis retail except in the C.1 to C.5 zones; and cannabis lounges.
Floodplain (s. 6.1): the underside of a floor system, or the top of a pad (a manufactured home's too), used for living, business or storing goods that floodwater could damage sits above the flood construction level (s. 6.1(5)). The level is the higher of those that apply (s. 6.1(2)): the provincial floodplain maps where they exist; 351.1 m beside Mara Lake, 393.2 m beside Kalamalka Lake and 604.72 m beside Sugar Lake (geodetic datum); 3 m above the natural boundary of Mabel Lake, and 3 m above the Shuswap River between Shuswap Falls and Sugar Lake (the bylaw doesn't say measured from what); 1.5 m above the natural boundary of any other watercourse, lake, marsh or pond. The floodplain and riparian setbacks are listed with the setbacks. Exempt from the level (s. 6.1(3)): a renovation that adds nothing, the carport, garage or entrance foyer part of a building, farm buildings other than dwellings and closed-sided livestock housing, and some industrial and livestock uses behind standard dykes or raised at least 1 m. The Board may grant an exemption from the level or the setbacks on a written request if it fits the provincial guidelines or an engineer or geoscientist certifies the land can be used safely (s. 6.1(10)); the Building Inspector may ask for a BC land surveyor's certificate (s. 6.1(9)).
Site-specific exceptions listed in the bylaw by legal description can add or change uses for one property, and development permit areas, the ALR and building rules apply on top. Confirm with the RDNO's planning department before you buy or build.
Source: Regional District of North Okanagan Zoning Bylaw No. 3000, 2023 (summarised in our words, checked 2026-11-14); zone map: RDNO Digital Data Files terms of use; Source: Regional District of North Okanagan GIS Department.
Regional District of North Okanagan Zoning Bylaw No. 3000, 2023 applies in North Okanagan, Electoral Area B.
CD2 in other BC bylaws: what CD2 allows in each of the 4 we've summarised.
Other zones in this bylaw
C.1 General Commercial, C.2 Highway and Tourist Commercial, C.3 Neighbourhood Commercial, C.4 Service Commercial, C.5 Recreation Commercial, C.6 Recreation Vehicle Campground / Resort Commercial, I.1 Light Industrial, I.2 General Industrial, I.3 Agricultural Industrial, R.1 Residential Single Family, R.2 Residential Two Family, R.3 Residential Multi-Family, R.4 Residential Manufactured Home Subdivision, R.5 Residential Manufactured Home Community, R.6 Residential Seasonal Single Family, R.7 Residential Dwelling and Recreational Vehicle, R.8 Residential Small-Scale, Multi-Unit Housing, S.H Small Holding, C.R Country Residential, N.U Non-Urban, L.H Large Holding, S.1 Spray Irrigation, S.2 Residential Attendance Program, S.3 Community Park and Public Use, CD.1 Fairhaven Ministries Comprehensive Development, CD.3 Cottonwoods Comprehensive Development, CD.4 Mabel Lake Seasonal Comprehensive Development, CD.5 Sugar Lake Comprehensive Development.