What if there's an old oil or gas well on a BC lot I'm buying?
The well's permit holder, past or present, must plug it and restore the site by set deadlines; we found no rule putting that on the landowner (our reading), and the BC Energy Regulator restores orphans.
Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.
What the answer means
Thousands of wells in northeast BC have stopped producing, and many sit on farmland and rural lots. In BC the duty to plug a well, take out its equipment and restore the land stays with the company that holds or held its permit, even after the permit ends or the well is sold, and since 2019 the Dormancy and Shutdown Regulation sets the years by which each dormant site must be cleaned up. A landowner is told of the work and keeps collecting rent until the site is certified restored.
- Inactive and suspended
- A well that hasn't been abandoned but hasn't been active for 12 months in a row (6 months for a special sour well) is inactive, and within 60 days its permit holder must suspend it in a way that keeps the well sound (Drilling and Production Regulation s. 25 (1), (5)).
- Abandoned
- To abandon a well is to plug it permanently (s. 1), so that fluids won't leak from it and the wellbore stays sound over the long term, with a report to the Regulator within 30 days (s. 26).
- Dormant
- A well is dormant once it has gone 5 calendar years without any of a set list of events, such as 720 hours of production or injection in a year, or once its permit holder tells the Regulator in writing that it is (Dormancy and Shutdown Regulation s. 3 (1)). A site whose permit was cancelled, spent or expired without a certificate of restoration is a former site, which the Regulator says is often one built but never drilled (s. 3.1).
- Who must clean it up
- The permit holder, or the former permit holder once the permit ends, must carry out every obligation not yet met, restoration included (Energy Resource Activities Act s. 40). A transfer, a cancellation or a certificate of restoration doesn't relieve them of an earlier liability (s. 42). We found no rule putting the plugging or the restoration on the landowner (our reading), and the Regulator says landowners aren't responsible for the property taxes on the oil and gas works on their land.
- The four stages and their deadlines
- A dormant site is decommissioned (the well plugged and the equipment removed), assessed for contamination under the Contaminated Sites Regulation, remediated where needed and restored (DSR ss. 6 to 9). Sites dormant by 2018 (type A) must all be decommissioned by December 31, 2031 and restored by December 31, 2036 (s. 15). Sites that went dormant from 2019 to 2023 (type B) have 8 years to be decommissioned and 13 to be restored, and those from 2024 on (type C) 5 and 10 (ss. 4, 16, 17). The Regulator can name a priority site and shorten those to 2, 3 and 5 years (ss. 5, 18).
- The landowner's say
- The landowner is an interested person: they can ask the permit holder to meet about its yearly work plan, which must be answered within 30 days, and get written notice before unplanned work on the site (DSR ss. 1, 13, 14).
- Orphan sites
- Where the permit holder is insolvent, no longer exists or can't be found, the Regulator can designate the well or site an orphan and restore it from the orphan site fund, which a levy on permit holders pays for (ERAA s. 45 (1) to (3)); the costs are a debt of the former permit holder and those related to it, not the landowner (s. 45 (7)). The Regulator publishes the list of orphan sites (s. 45.02) and says it aims to restore each within 10 years of its designation.
- Rent from an orphan site
- A landowner whose land the Regulator spends money on can apply to be paid from the fund for the loss of use of the land, taking account of rent owed under the surface lease (ERAA s. 46). Before a site is an orphan, unpaid rent goes to the Surface Rights Board; once it is one, the Regulator says the owner can apply to it directly.
- The certificate of restoration
- The Regulator may certify that the site's obligations were met on what it knows at the time; the certificate doesn't clear anyone of a matter it didn't know of then (ERAA s. 41 (2), (3)). The surface lease's rent runs until that certificate is issued, even if the lease's term ends first (Petroleum and Natural Gas Act s. 143 (1), (3)), though not for a flow line (s. 143 (2) (b)). The Regulator's file room sends copies of certificates on request.
- On the title
- A Surface Rights Board order granting or ending a right of entry is filed on the title and binds whoever owns the land (PNGA ss. 171, 173 (2)); one ending entry can require the land restored and a certificate of restoration first (s. 167 (3) (b)). A surface lease agreed with a past owner may not be on the title at all (our reading), so ask the seller for every one.
- Building near an old well
- We found no BC rule setting how far a house must stay from an abandoned or dormant well (our reading). The setbacks in the regulations bind the operator: no new well within 100 m of a permanent building, and flares and tanks 100 m from buildings not part of the activity (Drilling and Production Regulation ss. 5 (2), 47, 48). Ask the Regulator and the regional district before siting a house, well or septic field near one.
- What it means for a buyer
- A dormant well can be an income until it's restored and a site you can't use until then, and a site certified long ago can still turn up a problem nobody knew of (our reading). Find every well on the land before you remove subjects, and have a lawyer read each lease and order.
Our summary of the Drilling and Production Regulation (B.C. Reg. 282/2010), the Dormancy and Shutdown Regulation (B.C. Reg. 112/2019), the Energy Resource Activities Act, ss. 40 to 46, and the Petroleum and Natural Gas Act, ss. 143, 167, 171 and 173, as consolidated on BC Laws, and the BC Energy Regulator's orphan sites and landowner pages, read 2026-10-25. A liability reduction plan can change a permit holder's timelines (DSR Part 2), and a site decommissioned before it went dormant can have others.
Sources (read 2026-10-25; summarised in our own words unless noted): Dormancy and Shutdown Regulation, B.C. Reg. 112/2019; Drilling and Production Regulation, B.C. Reg. 282/2010; Energy Resource Activities Act, SBC 2008, c. 36; Petroleum and Natural Gas Act, RSBC 1996, c. 361, Part 17; Orphan sites, BC Energy Regulator; Land owners and compensation, BC Energy Regulator.
Before you buy: find the wells, then who to ask
The Regulator's own maps show the wells and sites it permits; their data isn't open, so we link them rather than show them: the Dormant Sites Map (each dormant site's operator, type and stage, from inactive to restored), the Orphan Site Map and the All Hazards Map, which finds what's permitted within a distance of a point.
- The seller or their agent
- Which wells and sites are on the land, which company holds each permit, what rent does each lease pay, is any of it unpaid, and has a certificate of restoration been issued for any of them?
- Your lawyer or notary
- Which surface leases and Surface Rights Board orders are on the title, and does the rent pass to me?
- The BC Energy Regulator
- What is each well's status and type, when must it be decommissioned and restored, is it an orphan site, and can I have a copy of any certificate of restoration?
Look up the lot above: its report lists the oil and gas pipelines within 200 m on the Regulator's permits, and who owns the land along each side.
See also oil and gas surface leases, pipelines, contaminated sites, who owns the oil and gas, old oil tanks and drilling a water well.
Buying rural land? Before you buy rural land in BC: the nine questions that decide an offer, on one printable page.