What should I check before buying oceanfront in BC?
Where the lot ends: it runs to the natural boundary, the visible high water mark, and the foreshore below it is Crown land unless the Crown grant says otherwise.
An ocean lot runs to the natural boundary, the visible high water mark, so the beach below it, and the dock and any seawall on it, most likely sit on Crown land (as our waterfront lot lines and docks pages read the Land Act).
Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.
What the answer means
An ocean lot carries the rules a rural lot does, plus a set that turns on the sea in front of it: where the lot stops, who may walk the beach, what may be built on the shore, how high and how far back a house sits, and what the salt water does to a well and a policy. Each step below restates the page that covers it.
- 1. Where the lot ends
- A waterfront lot runs to the natural boundary, the visible high water mark (Land Act s. 1), found on the ground, not in a table of levels. Unless the Crown grant expressly says otherwise, the bed and foreshore below it didn't pass to the owner of the land along the water, whatever the title or plan shows (s. 55). Land the sea slowly builds up becomes the owner's and land it wears away becomes the Crown's, while fill doesn't add land to a lot (Circular Letter No. 470; see waterfront lot lines).
- 2. The public on the shore
- Below the natural boundary the beach is Crown land in most of BC, open to the public whoever owns the lot above it. Many waterfront subdivisions also left a road end to the water: beside Crown water a new subdivision gives access by 20 m wide highways no more than 200 m apart, or 400 m where every new parcel is rural and over 0.5 ha (Land Title Act s. 75 (1) (c)), and the Province and councils keep these for the public (see road ends and public access to water).
- 3. The dock
- The Province's General Permission authorizes one private dock fronting a lot without an application when the dock's owner owns or leases the lot behind it, within its conditions and limits: on the sea, at most 60 m out, a float up to 14 by 3.7 m, and a biologist's marine habitat assessment before a new one is built. A dock that doesn't meet them, or one in an application-only area the Province maps for parts of the coast, needs a specific permission or a lease through FrontCounter BC (see docks and moorage).
- 4. The shore in front
- A report gives the Province's ShoreZone mapping of the shore in front of the lot, rock, beach, flat or estuary, and how exposed it is to waves. A wide flat can leave a dock dry at low tide, and an exposed shore takes the brunt of winter storms (our reading); see it at a low tide before you buy (see docks and moorage).
- 5. Walls and rock
- Building a structure or works below the natural boundary, or filling there, without the Province's authorization is an offence (Land Act s. 60 (e)), and work that harms fish habitat needs a federal authorization (Fisheries Act ss. 34.4, 35). Whether the Water Sustainability Act's stream rules reach a sea shore is unclear to us: ask FrontCounter BC before any wall, rock or beach work there (see seawalls, riprap and beach work).
- 6. Flood levels
- Where land floods, the local bylaw sets a flood construction level the lowest floor for living, business or storage must clear, and a setback from the water (Local Government Act s. 524). On the coast the Province's guidelines build that level from the sea's 1-in-200 year water level from tides and storm surge, the rise to 2100, waves and 0.6 m of freeboard, set by a coastal engineer (s. 3.5.5.1; see flood construction levels and floodplain maps).
- 7. Sea level rise
- The guidelines ask councils to allow for the sea rising 0.5 m by 2050, 1.0 m by 2100 and 2.0 m by 2200, and a building to stand at least 15 m back from where the natural boundary is expected in 2100, three times a bluff's height below a coastal bluff close to the shore (ss. 3.5.3, 3.5.5.1, 3.5.5.4). Each council sets its own level, and a flood covenant on the title may already say what a new house needs (see sea level rise).
- 8. Tsunamis
- Every stretch of BC's ocean coast is in one of five tsunami notification zones, A to E, which say which warnings reach that coast, not what a tsunami would flood. If you feel a strong earthquake, go to high ground as soon as the shaking stops; where a town states an evacuation height, a report sets the lot's ground beside it, and Tofino recommends 20 m above sea level or higher (see tsunamis).
- 9. Septic
- A septic field stays 15 m from the sea, 30 m from a lake, river or permanent stream and 30 m from a drinking-water well; an authorized person plans, installs and files it, and only test pits and a percolation test on the lot show whether the soil works (see septic).
- 10. A well by the sea
- Near the sea, fresh ground water floats on salt water, and a well near the shore can turn salty with pumping, its own or its neighbours'. A report gives the Province's rating of the aquifer under a coastal lot for sea water intrusion, Low to High (its 2021 map), and the Province advises testing a coastal well for chloride and electrical conductivity once a year, in the dry season (see wells).
- 11. Insurance
- Overland flood, water from a river, lake or the sea flowing onto dry land, is optional cover added to a home policy. Where flood risk is high an insurer may offer it only with a low limit or a high deductible, price it well above the rest of the policy, or not offer it (our reading), and the Province's Disaster Financial Assistance doesn't cover seasonal or recreational properties (see flood insurance and home insurance).
Each step's rules are our summaries on the pages linked below, each with its own sources and read date; the order is our reading.
Source: The question pages linked below (our summaries, each with its own sources and read date).
Each step, in full
- 1 and 2. The line and the public: waterfront lot lines and road ends and public access to water
- Where the lot stops and who may walk the shore below it.
- 3 to 5. The shore: docks and moorage and seawalls, riprap and beach work
- What may sit on the Crown foreshore and what changing it needs.
- 6 to 8. The sea coming in: flood construction levels, floodplain maps, sea level rise and tsunamis
- How high the floor goes, how far back the house sits, and what to do when the ground shakes.
- 9 and 10. Septic and water: septic and wells
- The field's setback from the sea and a shore well's salt.
- 11. Insurance: flood insurance and home insurance
- What a policy leaves out by the sea.
Before you buy: who to ask
- A BC Land Surveyor
- Where is the natural boundary today, against the plan the title rests on, and do the house, septic field or any wall sit across it?
- The seller or their agent
- How is the dock authorized, under the General Permission or a tenure on file, and what permission did any seawall or rock have? Has the well been tested for chloride, and has the sea ever reached the house?
- The local government
- What flood construction level and setback from the sea apply to this lot, and does a flood covenant on the title set them?
- An insurer
- Will you cover overland flood at this address, with what limit and deductible?
Look up the lot above: its report gives the shore type in front, the moorage tenures within 50 m, the tsunami zone and the ground's height, the aquifer's sea water intrusion rating, the room for a septic field and, where we've read the bylaw, the flood construction level.
See also buying lakefront, buying on an island, buying on a floodplain, float homes and before you buy rural land.
Buying rural land? Before you buy rural land in BC: the nine questions that decide an offer, on one printable page.