PlaceDossier / Zoning / City of Fort St. John

C-3: General Commercial

C-3 is a zone in City of Fort St. John Zoning Bylaw No. 2470, 2019 (City of Fort St. John). Our summary of Section 20 of the bylaw as amended to August 24, 2026.

What the zone allows

Homes allowed
Apartments only above the shops or offices of a mixed-use building (commercial on the ground floor), keeping the RM-4 zone's requirements for apartments, which allow at most 155 homes per hectare (ss. 20.2, 20.4.3, 17.3; the bylaw's definition of mixed-use, s. 3); or one caretaker suite with a business on the lot (s. 4.19). Which of RM-4's lot size, setback and floor area rules also bind the homes here is unclear: ask the City
Main uses
Shops and shopping centres, restaurants, pubs and liquor stores, hotels and motels, offices, personal services, a gaming facility, a theatre or cinema, recreation and amusement, a health services facility, a community care facility, a major daycare, schools run as businesses, art galleries and studios, a small brewery or distillery, a gas station, a car wash, vehicle sales and service, a bus depot and taxi offices, printing, broadcasting and media studios, dry cleaners and laundromats, minor animal services, trade contractors' offices, parking, cannabis retail, mixed-use buildings; accessory buildings and a caretaker suite (s. 20.2)
Smallest lot for a subdivision
555 m², 15.0 m wide (s. 20.3)
Lot coverage
40% (s. 20.3)
Height limit
21.0 m (s. 20.3)
Setbacks
Main building: front 1.5 m, inside sides 0 m, street side 3.0 m, rear 1.5 m; on a lot next to a residential (R or RM) or park (P) zone, sides, street side and rear 6 m (ss. 20.3, 20.4.2). Accessory buildings: not in the front yard; 1.0 m from inside lot lines, 3.0 m from a street side, 1.5 m from the rear line and from other buildings; 0.3 m more at the side and rear for each metre over 7.0 m high (ss. 4.6.2, 4.18.2, 4.18.3); and 3.0 m from a lot line next to a residential (R or RM) or park zone (s. 4.18.4); built only with or after the main building, in materials and colours like its own (ss. 4.18.1, 4.18.8). Every building and every part of one is 4.5 m from a provincial highway right-of-way (s. 4.9.3). Eaves, sills, bay windows, chimneys and the like may reach 1 m into a 3 m side yard, 0.5 m into a 1.5 m one and 1 m into the front or rear yard, if their foundations stay out of the yard, the feature takes no more than 20% of its wall and it adds no more than 3 m² of floor area to the yard; porches, decks and canopies at most half a side or rear yard's width; balconies and sun shades at most 1.5 m or half a side yard; patios, arbors, trellises, ponds, flag poles and ornaments in any yard; parking spaces and commercial EV chargers where the landscaping rules are met (s. 4.9.1). On a corner lot nothing over 1 m high within 9.0 m of where the curbs meet (s. 4.11)

The zone is to allow and encourage retail (s. 20.1).

Cannabis retail only where the whole lot isn't within 200 m of a school or 100 m of a park; adult entertainment is prohibited in this zone (s. 4.2).

Shipping containers (at most 1, s. 4.25.5) and temporary storage structures, at the rear, buffered from public view with fencing and planting, under the accessory building rules, never in the front yard, on parking, boulevards or landscaping, or as a main building (s. 4.25). For construction, with the Director's written approval, containers, temporary storage or a portable office may stand on the lot being built on until the work ends or stops for 6 months (s. 4.25.7).

Fences up to 1.2 m in the front yard and 1.8 m at the sides and rear (s. 4.13.3); fences may stand in setbacks, but not a watercourse setback or the corner sight triangle (s. 4.13.5); beside a highway they are see-through, beside the Alaska Highway opaque (s. 4.13.7); no chain link in the front or flanking yards (s. 4.13.9), and chain link facing public space gets coniferous massed planting on its outer side (s. 4.13.10); no barbed wire (s. 4.13.6). Unlike C-4, the zone isn't on the list of those that should be fenced on three sides (s. 4.13.1).

A caretaker suite: one per non-residential lot, only as an accessory use with a commercial, industrial or institutional use on it, walled off from that use; inside the main building it has its own outside entrance, shares the building's utility connections and is at most 40% of the building's floor area or 90 m², whichever is less (s. 4.19).

For the homes above the shops: A development of 4 or more homes needs amenity space: at least one of on-site trails, a private deck, patio or balcony for every home, a sport area, or raised garden beds (1 m² for every 5 homes); and at least one of a communal kitchen, a games room or fitness room (each with washrooms), a playground for children of all ages and abilities, or a pool, sauna or hot tub (s. 4.14).

Short-term rental of a home isn't a listed use; hotels and motels are. Ask the City before renting a home here by the night.

All storage sits at the rear of the lot, with landscaping and screening where the lot is next to an R, RM, P or INS zone (s. 5.2.1).

Landscaping (s. 4.12): a screen of massed planting at least 1.5 m high may buffer the lot from streets and public places (s. 4.12.5); a tree every 10 m along the lot line buffers it from the public realm, each in a tree cage, and another every 10 m along a line next to a different zone, or the equivalent the Director accepts (ss. 4.12.7, 4.12.24); outdoor garbage and storage areas are screened by solid or opaque fencing, and garbage, recycling and rooftop services hidden from public view by solid wood fencing or massed planting (ss. 4.12.21, 4.12.25); landscaping softens parking from the street and buffers buildings and parking from residential lots and greenspace (ss. 4.12.22, 4.12.23). Plantings are local, climate-suited species, shrubs in at least No. 5 pots and trees at least 8 cm caliper, three deciduous trees to one coniferous (ss. 4.12.12 to 4.12.18). Outside a development permit area, a development needing more than 5 trees needs a landscape plan signed by a qualified professional and a deposit of the works' full cost before the building permit; 80% comes back once the work passes inspection and 20% is held up to two years (s. 4.12.26).

A building permit for a multiple dwelling, commercial or institutional development follows the bylaw's accessible design rules: a main entrance no steeper than 1:20, accessible parking beside the ramp, walkways open at all hours and lit, and the Building Access Handbook's specifications (s. 4.15).

Parking for businesses (s. 5.8, Table 4): retail and financial institutions 1 space per 20 m² of floor area, professional offices 1 per 30 m² (at least 1 per tenant), personal services 1 per 15 m², restaurants 1 per 3 seats, hotels 1 per 2 guest rooms and motels 1 per room (plus 1 per 3 bar or restaurant seats), a use the table doesn't list 1 per 20 m²; a suite 1 per bedroom.

Parking spaces at least 3.0 m by 6.5 m (7.5 m long for parallel parking, 5.8 m long and 2.5 m high in a parkade), aisles 4.0 m to 7.3 m wide by angle (s. 5.7, Table 2); a parking lot of more than 3 spaces next to an R, RM or P zone keeps a 1.5 m landscape screen along that edge, and one on a road a tree every 10 m along it; one of 20 or more spaces has engineer-certified lighting of at least 6 lux, and one of more than 20 landscaped islands every 10 spaces in a single row or 20 in a double row (ss. 5.7.4 to 5.7.8); a lot of more than 20 spaces gives 1% of the required spaces, at least 1, as accessible spaces (s. 5.3). Required parking isn't used for loading, driveways, repair work, display sales or storage (s. 5.2.2). Uses standing when the bylaw was adopted needn't meet these rules until added to or changed, and then the Director may relax them by up to 25% (s. 5.5).

Bicycle parking for at least 5 bicycles unless the Director says otherwise, on a hard surface, theft-resistant and anchored, at least 40% of it for visitors, never in parking stalls, boulevards, landscaping or walkways (s. 5.4).

Commercial EV chargers are an accessory use, each with its own hard-surfaced space that still counts toward the required parking (s. 5.10).

With the Director's approval and a 20-year agreement on title signed by the City, parking may be shared between uses or set on another lot within 150 m (s. 5.2.3).

In a non-residential zone the parking may be within 150 m of the use (s. 5.7.3), and the owner may pay $8,000 a space into the City's parking fund instead, as many as the Director allows (s. 5.6).

Loading: 1 space per 2,790 m² of floor area for commercial, institutional and industrial uses (freight terminals and rail yards 1 per 1,869 m²), each at least 3 m by 7.5 m with 4 m of clearance, paved and drained, on the lot, out of the front and side yards and 8 m from an intersection (s. 5.9).

Chimneys, smoke stacks, domes, cupolas, fire towers, cranes, rooftop equipment and dishes, monuments, poles and floodlights, utilities, antennas and radio towers, silos, spires, transmission towers and wind turbines don't count toward the height limit where they cover no more than 20% of the lot or, on a building, 10% of the main building's roof (s. 4.10.1).

Entrances, pedestrian connections and dark corners are lit, as are parking and open space with poor sight lines; landscaping marks the main entrances and doesn't block surveillance, shrubs kept to about 1.2 m and trees pruned (s. 4.16).

New buildings should face within 15 degrees of due south and use natural ventilation, and buildings over 500 m² should meet 10% of their lighting and space heating with renewable and efficient technology (s. 4.17; the bylaw's "should" is at the Director's discretion, s. 1.8.2).

Allowed in every zone, except where the bylaw bars it or on land in the Agricultural Land Reserve: uses, buildings and structures accessory to a permitted use on the lot; underground telecommunication lines and telephone exchange buildings; pipelines, telecommunication towers and wires, traffic control devices, clock towers and underground utilities; parks, open space, community gardens, playgrounds, playing fields, multi-use trails and ecological reserves; a place of worship (which by definition may include a suite for its minister, s. 3); a municipal public works yard; transportation rights-of-way set by a government or Crown corporation; public utility facilities for water, sewage, power, telephone, gas and cable (not sewage treatment plants, electrical substations or power generation), on lots exempt from the minimum lot area; and parking lots, as an accessory or a principal use (s. 4.3). Barred in every zone unless the zone lists them: a cannabis production facility (bar a farm use in the Agricultural Land Reserve) and a supervised consumption facility (s. 4.2.1).

Every zone is open to temporary use permits: Council or its delegate may allow a use the zone doesn't, for up to 3 years and renewed once by Council resolution, weighing its fit with neighbouring land, the environment and whether it could go elsewhere, with conditions such as removal or restoration by a date, a letter of credit, hours and area (s. 4.5).

A lot registered before the bylaw was adopted (October 28, 2019) that is smaller or narrower than the zone sets is lawfully non-conforming and keeps the zone's uses (s. 4.8.1). Lot lines may move to fit existing development without meeting the minimums where no lot is added, the lots touch and none grows enough to subdivide further (s. 4.8.3); the minimum lot area may be cut by up to 10% where part of the lot is needed to widen a road and the cut lets the lots fit the City's road grid (s. 4.8.4, one of whose conditions is garbled, so ask the City); a lot on a cul-de-sac bulb needs only 11 m of width, measured along the curve (s. 4.8.5).

Site-specific exceptions listed in the bylaw by legal description can add or change uses for one property, and development permit areas, the ALR and building rules apply on top. Confirm with the City of Fort St. John's planning department before you buy or build.

Source: Section 20 of City of Fort St. John Zoning Bylaw No. 2470, 2019 (summarised in our words, checked 2026-10-31); zone map: Open Government Licence – City of Fort St. John.

City of Fort St. John Zoning Bylaw No. 2470, 2019 applies in Fort St. John.

C-3 in other BC bylaws: what C-3 allows in each of the 19 we've summarised.

Other single-detached, two-unit, manufactured home (R-4, and R-4A on small parcels) and medium- and high-density multiple dwelling (RM-1, RM-2) housing zones, Downtown Core Commercial (C-2), General Commercial (C-3), Highway Commercial (C-4), Light Industrial (M-1), Heavy Industrial (M-2), Institutional (INS-1) and Parks, Recreation and Natural Areas (P-1) zones in this bylaw

R-1 Single-Detached Housing, R-2 Two-Unit Housing, R-4 Manufactured Home, RM-2 Multiple Dwelling Housing (High Density), C-4 Highway Commercial, M-1 Light Industrial, C-2 Downtown Core Commercial, R-4A Manufactured Home (Small Parcel), M-2 Heavy Industrial, P-1 Parks, Recreation and Natural Areas, INS-1 Institutional, RM-1 Multiple Dwelling Housing (Medium Density).