What happens to a BC lot's septic system when a sewer main arrives?

A council or regional district can require a lot beside a new sewer main to connect within a time its bylaw sets, and then to empty and take the old tank out of use.

Opens the lot's report at this answer. If an address isn't found, try the PID, the 9-digit parcel number on the land title or assessment notice.

Share

TextEmail

Text and Email open your messages or email app with this message, ready to edit.

What the answer means

Sewer usually reaches a street of septic systems as a project the council or regional district builds and charges for. Once a main runs beside a lot, its sewer bylaw can require the owner to connect by a set date, at the owner's own cost on the lot, and to empty and fill or remove the old tank. Each bylaw sets its own deadline, exemptions and fees, so the rules are the local government's.

Can they make you connect?
A council may, by bylaw, regulate and impose requirements in relation to municipal services, including requiring owners to do things with their property at their own expense (Community Charter s. 8 (3) (a), (8) (c)). A regional district board may, by bylaw, require owners to connect their buildings to the appropriate sewer connection in the manner the bylaw specifies (Local Government Act s. 306 (b)). Whether a given bylaw does, and by when, is in its own text.
A worked example: Langford
The City of Langford's Sewer Utility Bylaw requires every owner of a parcel fronting a sewer main, with a building that makes sewage, to connect it and every plumbing fixture on it by the later of one year after the main is finished and December 31, 2019, and its engineer may set the date by written notice (Bylaw No. 1600, ss. 1, 5, 7). A parcel counts as fronting a main when the main runs in a road or right of way along any of its boundaries (s. 1).
Exemptions
Langford's bylaw leaves out, for up to 5 years after it was built, a lot whose Type 3 system complying with the Sewerage System Regulation went in within the 5 years before the main was finished, if an engineer certifies it and, on its three lakes, its field sits above a set level and 15 m from the water (s. 8). Other bylaws set their own, or none: ask.
Applying and the pipe
The owner applies in writing with the connection fee; the city's engineer decides where the pipe from the main reaches the lot and installs it, and the owner's own pipe to the house needs a building or plumbing permit (ss. 6, 9, 11, 12, 17). Where gravity can't carry the sewage, the engineer may require a pump the owner provides (s. 19). The pipe on the lot is the owner's to keep in repair (see perimeter drains for one council's rule on laterals).
The old system
Within 30 days of connecting, Langford's owner must pump out the septic tank and either remove it or hole its bottom and fill it with sand or gravel, dispose of the contents lawfully, and send the pump-out receipt and as-built drawings before final approval (s. 21). Where a bylaw is silent, the Province's Standard Practice Manual gives the method: pump the tank out and take the contents to an approved facility, then remove the tank or leave it in place with holes in its bottom or a side broken away, so it holds no groundwater, and fill it completely with well-drained soil such as sand, never clay or organic soil, so it can't settle, cave in or float (SPM v3, III-6.4.4, III-7.3.3.2). Ask the local government or health authority whether it wants anything more.
What it costs
The connection fee is in the bylaw's schedule. The main itself is often paid by the lots it serves through a local area service or parcel tax (Community Charter ss. 210 to 213; see parcel taxes) or, where a developer built it, a latecomer charge on connecting; after that a yearly sewer user fee. The connection on the lot is the owner's (our reading).
Before you buy
A lot whose street is getting sewer may face a deadline, a fee, a parcel tax and the work on the lot within a year or two of buying, and a septic system recently replaced may only buy a few years' grace. The seller's knowledge and the local government's engineering department are the only sources: sewer extensions aren't on an open map (our reading).

Our summary of the Community Charter (SBC 2003, c. 26), s. 8, and the Local Government Act (RSBC 2015, c. 1), s. 306, on BC Laws, the City of Langford's Sewer Utility Bylaw No. 1600, 2016 (consolidated to March 16, 2026), and the Ministry of Health's Sewerage System Standard Practice Manual, version 3 (2014), on tank abandonment, read 2026-10-25. Langford's bylaw is one example: every council and regional district sets its own deadline, exemptions and fees, and some require nothing.

Sources (read 2026-10-25; summarised in our own words unless noted): Community Charter, SBC 2003, c. 26, Part 2 (s. 8); Local Government Act, RSBC 2015, c. 1, Part 9 (s. 306); City of Langford, Sewer Utility Bylaw No. 1600, 2016 (consolidated to March 16, 2026); Sewerage System Standard Practice Manual, version 3 (September 2014), Ministry of Health, III-6.4.4 and III-7.3.3.2.

Before you buy: who to ask

The seller or their agent
Has the local government said sewer is coming to this street, or sent a notice to connect? When was the septic system last replaced, and what type is it?
The local government
Does a sewer main run beside this lot or is one planned? Does your bylaw require a connection, by when, with what exemptions? What are the connection fee, any parcel tax or latecomer charge, and the yearly user fee? How must the old tank be taken out of use?

Look up the lot above: its septic section says whether it sits in a mapped sewer service area, and how near a main is where the city's map shows one.

See also septic systems, community water and sewer, latecomer charges, parcel taxes and backwater valves.